User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Work in progress draft
PEA-2292 (talk | contribs)
Blanked the page
Tag: Blanking
 
(680 intermediate revisions by the same user not shown)
Line 1: Line 1:
Gales Sir (1864-1948)


*1887-95, [[North Western Railway]](NWR) Survey and construction work <ref name=GG1922>[http://www.gracesguide.co.uk/1922_Who's_Who_In_Engineering:_Name_G Grace's Guide "Who's Who 1922"]; Retrieved  16 Jul 2016</ref>.
*1895-1900, NWR Assistant Manager and [[East Coast Railway]]; and Deputy Manager [[Eastern Bengal State Railway]] <ref name=GG1922/>.
*1901-05, [[Curzon Bridge, Allahabad]] Executive Engineer and Engineer-in-Chief, see 'References' <ref>[https://www.bl.uk/catalogues/indiaofficeselect/PhotoShowDescs.asp?CollID=852 The British Library India Office Records Photograph shelfmark 430/58 "The Curzon Bridge" carries the following description:- ''The Curzon Bridge over the River Ganges at Allahabad. 15 spans of 200 feet. Started 8th November 1902. Opened for Railway Traffic 15th June 1905. Opened for Road Traffic 20th December 1905'. Above this in the top corner is the note: 'With R.R. Gale's compliments'. Print 1 is a portrait of Gale, the Engineer-in-Chief, and his assistants and the remaining photographs provide a chronological record of the bridge's construction from December 1902 to December 1905.'']; Retrieved  16 Jul 2016</ref>
*1905-08, [[Bombay-Sind Connection Railway]] Survey Engr.-in-Chief; and [[Coonoor—Ootacamund Mountain Railway]] Engineer-in-Chief <ref name=GG1922/>.
*1909-15, Sara Ghat Bridge, Engineer-in-Chief, when completed the bridge was inaugerated as the '[[Hardinge Bridge]]' and formed a vital link in the [[Eastern Bengal Railway|Eastern Bengal State Railway]]. This was a major engineering challenge as fully described in the 'The Engineer' of October 1914 <ref>[http://www.gracesguide.co.uk/images/d/d9/Er19141002.pdf The Engineer October 1914, pages 316-318- "Bridge over the Lower Ganges" reproduced by Grace's Guide]; Retrieved  16 Jul 2016</ref>
*1915-17, [[Railway Board]] Chief Engineer<ref name=GG1922/>
*1917-19, [[North Western Railway]](NWR) Agent<ref name=GG1939>[http://www.gracesguide.co.uk/1939_Who's_Who_In_Engineering:_Name_G Grace's Guide "Who's Who 1939"]; Retrieved  16 Jul 2016</ref>.
*1919-37,  Partner in Rendel, Palmer and Tritton, Consulting Engineers, London.
*1937 Retired
,
==References==
<references/>

Latest revision as of 17:57, 30 December 2020