Daund-Baramati Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
Jethwarp (talk | contribs)
Created page with 'Category: Railways'
 
PEA-2292 (talk | contribs)
Further Information added
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[Category: Railways]]
The "Daund-Baramati Railway" was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) track completed in 1906. This connecting [[Daund]] to [[Baramati]], a distance of 23 miles(37 km) with one intermediate station at Kathphal. The line was worked by the [[Great Indian Peninsula Railway]](GIPR)
 
== External Links ==
*[http://en.wikipedia.org/wiki/Daund "Daund"] Wikipedia
*[https://en.wikipedia.org/wiki/Kutch_Gurjar_Kshatriyas_contributions_to_the_Indian_railways "KGK Contributions to the Indian Railways"] Wikipedia
 
== Further Information==
See '''[[Great Indian Peninsula Railway]]'''
 
[[Category:Railways]]
[[Category:State Railways]]

Latest revision as of 17:22, 22 February 2016

The "Daund-Baramati Railway" was a metre gauge(MG) track completed in 1906. This connecting Daund to Baramati, a distance of 23 miles(37 km) with one intermediate station at Kathphal. The line was worked by the Great Indian Peninsula Railway(GIPR)

External Links

Further Information

See Great Indian Peninsula Railway