Naginimora Branch Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
Revised information added with references
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''Naginimora Branch Railway'''
The '''Naginimora Branch Railway''' was a branch line of the [[Assam-Bengal Railway]](ABR), under construction in 1911. The line was an extension to the [[Dikhow Extension Railway]] which opened to [[Bihubar]] in 1913.


Branch line of ABR(qv), under construction 1911
The 2.3 miles(3.7km) extension from [[Bihubar]] to Naginimara, opened 1917 <ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n161/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing, Calcutta;  page 153]; Retrieved 20 Dec 2017</ref>


{{Work-in-Progress-Rly}}
==Further Information==
See '''[[Assam-Bengal Railway]]'''
 
== References ==
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]

Latest revision as of 10:41, 21 December 2017

The Naginimora Branch Railway was a branch line of the Assam-Bengal Railway(ABR), under construction in 1911. The line was an extension to the Dikhow Extension Railway which opened to Bihubar in 1913.

The 2.3 miles(3.7km) extension from Bihubar to Naginimara, opened 1917 [1]

Further Information

See Assam-Bengal Railway

References