Wazirabad-Multan Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
m 'Paget Patrick Dease' spelling corrected; PWD added
PEA-2292 (talk | contribs)
mNo edit summary
 
Line 4: Line 4:
The '''Wazirabad-Lyallpur State Railway''' section was under construction in 1894 with [[Henry Herbert Gahan]], PWD,  as Superintendent of Works <ref> [https://play.google.com/books/reader?id=b2NPAAAAMAAJ&printsec=frontcover&output=reader&hl=en_GB&pg=GBS.PA499 Google Books " India List and India Office List, 1905" page 499 (pdf page 462)] Retrieved on 18 May 2016</ref>.
The '''Wazirabad-Lyallpur State Railway''' section was under construction in 1894 with [[Henry Herbert Gahan]], PWD,  as Superintendent of Works <ref> [https://play.google.com/books/reader?id=b2NPAAAAMAAJ&printsec=frontcover&output=reader&hl=en_GB&pg=GBS.PA499 Google Books " India List and India Office List, 1905" page 499 (pdf page 462)] Retrieved on 18 May 2016</ref>.


This broad gauge([[Rail_gauge#Broad_Gauge|BG]]) railway became part of the mainline of the [[North Western Railway]] network
This broad gauge([[Rail_gauge#Broad_Gauge|BG]]) railway became the North Western Railway(NWR) 'Wazirabad-Khanewal Branch Line'.


== References ==
== References ==

Latest revision as of 06:31, 10 December 2017

The Wazirabad-Multan Railway was under survey in 1892 by Paget Patrick Dease, Exucutive Engineer from the the Public Works Department (PWD) [1].

The Wazirabad-Lyallpur State Railway section was under construction in 1894 with Henry Herbert Gahan, PWD, as Superintendent of Works [2].

This broad gauge(BG) railway became the North Western Railway(NWR) 'Wazirabad-Khanewal Branch Line'.

References