User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Work in progress draft
PEA-2292 (talk | contribs)
Blanked the page
Tag: Blanking
 
(587 intermediate revisions by the same user not shown)
Line 1: Line 1:
The '''[[Gaekwar's Dabhoi  Railway]]''' was the original name of the ox-driven line between [[Dabhoi]] and Miyagam Karjan,  a distance of 20 miles(33km) and opened in 1862. The line was laid during the reign of Sir Khanderao Gaekwar of Baroda, the Maharaja of Vadodara. Owned by the [[Princely states|Princely ]][[Baroda State]], it was the first railway built and operated by a Native Prince. <ref>[https://en.wikipedia.org/wiki/Gaekwar%27s_Baroda_State_Railway Wikipedia “Baroda State Railway”]; Retrieved 12 Oct 2016</ref><ref name=indian>[https://indianrlynews.wordpress.com/tag/gaekwars-baroda-state-rlys/ "Gaekwar's Baroda State Railway" by Vikas Singh, Editor of Indian Steam Railway Society Magazine]; Retrieved 12 Oct 2016</ref>


The line was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) with rails weighing 13 lbs to a yard. The line was designed and constructed by A.W.Forde. A pair of oxen used to haul trains composed of 4-6 vehicles. In 1863, Khanderao purchased 3 steam locomotives built by Neilson and Co., Glasgow. These 0-4-0 ST locomotives proved to be too heavy for the rails. During the reign of Malharrao in 1871, the old rails were removed and new rail 30 lbs to a yard were laid. The 20mile(32km) ‘Dabhoi-Miyagam’ line was reopened for traffic on 8 April 1878  <ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n44/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 36 and 37]; Retrieved 12 Oct 2016</ref>
An Agreement was made, effective from 1 Jan 1897, with the [[Bombay, Baroda and Central India Railway]](BB&CIR) for the management, maintenance and working of the ‘Dabhoi Railway’ on behalf of the ‘Government of His Highness the Maharaja Gaekwar of Baroda’ <ref name=Admin1918/>.  It is not known if BB&CIR were responsible prior to this date.  Certainly from this date onwards the BB&CIR were totally responsible for the operation.
Dabhoi by 1909 had become an important narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway junction as the Gaewar’s Dabhoi Railway was expanded; it became the centre where the lines from Miyagam, Chandod , Bodeli and Baroda converge <ref>[http://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V11_106.gif  “Imperial Gazetteer of India 1908”, v. 11, p. 100 ]; Retrieved 12 Oct 2015</ref>. ''Note that Baroda is now named Vadodora''
A Contract dated 8 April 1907, effective from 1 Jan 1906, between the Secretary of State and the BB&CIR formalised the arrangements for ‘the management, maintenance and working’ of the Dabhoi railway <ref name=Admin1918/>.
Further expansion of the network initiated an Agreement, dated 9 May 1916 between the  ‘Government of His Highness the Maharaja Gaekwar of Baroda’ and the BB&CIR for the ‘management, maintenance and working, by the Company, of the Miyagam-Malsar, Dabhoi-Jarod, Jarod- Samlaya, Samlaya-Timba, Masor Road-Jambusar and the Motipura-Tankhala extensions from the dates they are or shall have been opened for public traffic’ <ref name=Admin1918/>. 
With the completion of the ‘Dabhoi-Jarod Line’ in 1919 a total of 187 miles(299km) of Gaekwars Dabhoi Railway was open <ref name=Admin1918/>. 
The railway was re-titled the '''[[Gaekwar's Baroda State Railway]]''' (GBSR) in about 1920, this would be a result of the continued expansion or the network into Baroda State
Two lines had been sanctioned in 1914 for construction by the Gaekwar's Dabhoi Railway, these were completed by the GBSR . The ‘Choranda-Moti Koral Line’,  12 miles(19km), finally opened in 1921 Nov 10; and the ‘Motipura -Taukhala Line’, 26 miles(42km), did not open until 1923 March 15.
[[File: Gaekwars Dabhoi Railway Maps.png|thumb|Gaekwars Dabhoi Railway Maps]]
==Opening of Gaekwar’s Dabhoi Railway lines in chronological order==
Information retrieved from “Administration Report on Railways 1918”  <ref name =Admin1918/>
*’Dabhoi –Miyagam  Line’, 20 miles(32km);  1862,  the original Gaekwar's Dabhoi  Railway, driven by oxen; 1873 Apr 4, line re-laid in stronger rails;1878 Jan 8,  date of reopening, locomotives introduced from about 1878
*’Dabhoi-Chandod Line’ 11 miles(17km); Dabhoi to Chandod, 11 miles(17km), 1879 Apr 15
*’Dabhoi-Bodeli Line’ 22 miles(35km); Dabhoi to Sankheda Bahadarpur, 10 miles(15km), 1879 Sep 17;  Sankheda Bahadarpur  via Chhuchapura Junction to Bodeli, 12 miles(20km), 1890 Jun 16
*’Dabhoi-Baroda Line’ 19miles(34km); Dabhoi  to Goya Gate, 17 miles(31km), 1880 Jul 1, Goya Gate  to Baroda (Vishvamitri Station),; 2 miles(3km), 1881 Jan 24;
*’Baroda-Masor Road Line’ 20miles(32km); Baroda (Vishvamitri Station) to Padra, 7 miles(11km), 1897 Jul 1; Padra to Mobha, 6 miles(10km), 1903 Jul 10; Mobha to Masor Road, 7 miles(11km), 1904 Nov 11
*’Miyaram Karjan-Malsar Extension’  to the ‘Dabhoi-Miyaram Line’ giving total 44 miles(56km); Miyaram via Chorada Junctionto Malsar, 24 miles(44km), 1912 Jan 15
*’Dabhoi-Timba Line’ 62 miles(100km); Daboi to Jarod, 24 miles(38km), 1913 Nov 15; Jarod to Samlaya Junction, 5 miles(9km), 1915 Dec 13; Samlaya via Savli to Timba, 33 miles(53km) 1919 Feb 1
*’Dabhoi-Jambusar Line’ an extension of the ‘Dabhoi-Masor Road Line’ giving  total  59 miles(94km); Masor Road to Jambusar, 7 miles(11km), 1917 May 1
==Lines Worked as an extension to Gaekwar’s Dabhoi Railway==
*[[Bodeli-Chiota Udeipur Railway]] 22.5 miles(36km) opened in 1917-18 jointly between Baroda and Chota Udaipur Durbars from Chhuchapura Junction on the ‘Daboi-Bodeli Line’
==Further Information==
For further development after 1920 see  '''[[Gaekwar's Baroda State Railway]]'''.
== References ==
<references />
[[Category:Railways]]
[[Category:Indian States Railways]]
[[Category:Narrow Gauge (NG) Railways]]

Latest revision as of 17:57, 30 December 2020