User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
No edit summary
PEA-2292 (talk | contribs)
Blanked the page
Tag: Blanking
 
(24 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''East Indian Railway - Lines owned and worked'''


<blockquote>- a sub-section of the '''[[East Indian Railway]]'''(EIR) page</blockquote>
[[East Indian Railway]](EIR) owned and operated an extensive network of railways of broad gauge([[Rail_gauge#Broad_Gauge|BG]]),  in 1905 the route mileage was  1962 miles(3157km).
<br>By 1918 was  2775 miles(4465km) as detailed below in section  [[East_Indian_Railway_-_Lines_owned_and_worked#BG_Lines_-_owned_and_worked_by_EIR|'''BG Lines - owned and worked by EIR at 1918''']] 
The ‘[[Oudh and Rohilkhand Railway]]’ was amalgamated with the EIR on 1 July 1925 to comprise the ‘East Indian Railway System’ and the total system comprised 4217 miles(6787km).
<br>By 1937  was  4217 miles(6787km)  as detailed  below in section [[East_Indian_Railway_-_Lines_owned_and_worked#BG_Lines_-_owned_and_worked_by_EIR|'''BG Lines - owned and worked by EIR at 1937''']]<ref name=Hist>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ pages 81-86 pdf 110-115]; Retrieved  26 Aug 2020</ref>. 
The EIR also managed, worked and maintained a number of lines on behalf of other parties .
<br>As detailed below in section [[East_Indian_Railway_-_Lines_owned_and_worked#BG_Lines_worked_by_EIR_at_some_time|'''BG Lines Worked by EIR at some time ''']]
[[File: East Indian Railway Map 1909, east section.png| right|600px|thumb| East Indian Railway Map 1909, east section - Howrah (Calcutta) to Gaya]]
[[File: East Indian Railway Map 1909, mid section.png| right|600px|thumb| East Indian Railway Map 1909, mid section__ - Gaya to Cawnpore]]
[[File: East Indian Railway Map 1909 west section.png| right|600px|thumb| East Indian Railway Map 1909, west section - Cawnpore to Delhi]]
==BG Lines - owned and worked by EIR at 1918==
The listings below are generally based on the “Administration Report on Railways 1918”  <ref name =Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n61/mode/1up “Administration Report on Railways 1918” pages 53-56 (pdf 62-65]; Retrieved  4 Nov 2016</ref> with page numbers (and pdf pages) noted at the end of each entry.
<blockquote>1918 Total -  2464 miles(3965km). Page 53 (pdf 62) </blockquote>
==='''[[Howrah-Delhi EIR Main Line]]'''===
First section [[Howrah]] to [[Hooghly]], 24 miles(38km,) opened 1854; via Khana Junction-Bhagalpur-Jamalpur-Luckeesera-Mogul Sarai to Allahabad with the opening of the [[Jumna Bridge]]  completed 1865; connecting to the Allahabad via Cawnpore and Ghaziabad to Delhi (South Bank, Jumna River) in 1864, and to Delhi Terminus in 1867; 864 miles(1643km). Page 53 (pdf 62)
==='''[[First Chord EIR Line]] '''===
Khana Junction-Sitarampur, opened in stages from 1855-63; reaching Luckeeserai 1871. 183 miles(294km. Page 53 (pdf 62). Initially called the Chord Line but then re-designated as the Main Line. 
==='''[[Sahibganj Loop EIR Line]]'''===
Khana Junction-Bhagalpur-Jamalpur-Luckeeserai section of the Main Line 250 miles(402km) became secondary with the opening of the First Chord, reducing Howrah-Delhi to 943 miles (1517km). Page 53 (pdf 62) 
==='''[[Bhagalpur Bausi Branch Railway’|Bausi Branch Railway]]'''===
A branch railway from Bhagalpur to Mandar Hill; under construction 1907 for EIR as a branch of the [[Sahibganj Loop EIR Line]];  dismantled in 1917-18 for reasons unknown.
==='''[[Grand Chord EIR Line]]'''===
Sitarampur-Gaya-Mogul Sarai, first section to Barakar , 1865; to Gaya and Mogul Sarai 1900. 278 miles(447km). Page 54 (pdf 63) 
=== [[Howrah-Burdwan Chord Railway]]===
Howrah to Saktighar,6 miles(10km) 1917; 45 miles(72km). Page 54 (pdf 63) 
==='''Branches from the [[Howrah-Delhi EIR Main Line]]'''===
Alphabetical order with page and pdf references from the “1918 Report on Railways” ”  <ref name =Admin/> and IOR source<ref name=IOR>British Library IOR/L/F/8/10/985 ‘Indenture between Secretary of State and East Indian Railway Company as to Certain Branch Lines, November 1893’</ref>.
* ‘Agra Branch Line’ ; Tundla to Jumna Bridge, 1862; Jumna Bridge to Agra City, 1907; total 15 miles(24km). Page 55 (pdf64)
* ‘Allahabad Fort Branch Line’ ; Allahabad Fort, 1859; 2.3 miles(3.7km), Page 55 (pdf64); extension to Daraganj sanctioned 1914, 1.9 miles(3km), Page 56(pdf65)
* ‘Bandel-Barharwa Branch Line’ ; Bandel to Barharwa, 1911-13; 166 miles(267km). Page 54 (pdf 63) 
* ‘Benares Branch ‘ - the branch railway from the  [[Mogul Serai ]] station, on the main line of the EIR to the right bank of the River Ganges, opposite Benares . This date of opening of this branch is not known, on 1 Oct 1887 the branch of the [[Dufferin Bridge]]  by the  [[Oudh and Rohilkhand Railway]](O&RR) on the 16 Dec 1887. <ref name=IOR/>. ''This would probably have made this branch line redundant but not confirmed''
* ‘Benares Chord Line ‘; to Bechupur, connecting to the [[Oudh and Rohilkhand Railway]], 1910; 1.2 miles(1.9km). Page 54 (pdf 63) 
* ‘Bhadreswar Branch Line’ ; Bhadreswar to River Bank, 1882; 2.6 miles(4.2km). Page 54 (pdf 63). A branch line of railway from the EIR station at Bhadreswar to the right bank of the River Hughli at Pulta Ghat <ref name=IOR/>
* ‘Cawnpore City Branch Line’ ; Cawnpore, 1879; 0.9 miles(1.4km). Page 55 (pdf64)
* ‘[[Deoghar Branch Line]]’ ; Jasidih to Baidyanathdham, opened 1882 as the metre gauge ([[Rail_gauge_#Metre_Gauge|MG]]) MG [[Deoghur Railway]], originally owned and worked by [[Burn & Co Ltd]] until merged in EIR, 1911; converted to BG 1913;  4.1 miles(6.6km). Page 54 (pdf 63)
* ‘Digha Ghat Branch’ ; Bankipore to Digha Ghat, 1885;  5.5 miles(8.8km). Page 54 (pdf 63). A branch line of railway from the EIR station at Bankipur to the right bank of the Ganges at Digha Ghat. The EIR at Digha Ghat connected to the '[[Bengal and North-Western Railway]]'5B&NWR) at Palaza Ghat on the opposite bank by the [[Ganges Ferry, Digha Ghat-Sonpur|Digha Ghat Steam Ferry]] <ref>[https://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V22_096.gif ‘Imperial Gazetteer of India’, v. 22, p. 90. ]; Retrieved 16 Apr 2020</ref>
* ‘Giridih Branch Line’ ; Madhupar to Giridih, 1871; 27 miles(43km). Page 54 (pdf 63) 
* ‘Hathras Branch Line’ ; Hathras Junction to Hathras Kilah, 1898; 5.6 miles(9km). Page 55 (pdf64)
* ‘Ikrah Branch Line’ ; Ikrah to Barabani, 1894; Barabani to Sitarampur; total 15 miles(24km). Page 54 (pdf 63)
* ‘Jubbulpore Branch Line’; Naini to Jubbulpore; 1867; 224 miles(360km). Page 54 (pdf 63) 
* ‘Mokameh Ghat Branch Line’ ; Tal Junction to Mokameh, 1883; 3miles(4.8km). Page 54 (pdf 63). A branch line of railway from the EIR line to Mokameh to the- right bank of the River Ganges <ref name=IOR/>.
* ‘Naihati Branch Line’ ; Bandel to Naihati, 1887; 4.5 miles(7.2km]. Page 54 (pdf 63)
* ‘Ondal-Sainthia Chord Line’ ; Ondal to Sainthia, 1906; 43 miles(69km). Page 54 (pdf 63) 
* ‘Ondal Loop Line’ ; [[Ondal-Baboissola Railway|Ondal -Baboissola]] section opened 1864, constructed by the [[Tarkessur Railway]] Company and worked by EIR, incorporated into EIR 1915 as part of the ‘Ondal Loop Line’ ; Baboissola to Toposi, 1863; Toposi via Ikrah to Rupnarainpur , 1894-5; total 32 miles(51km). Page 54 (pdf 63) 
* ‘Patna Ghat Branch’; Patna to Patna Ghat, 1862; 0.9 miles(1.4km). Page 54 (pdf 63) 
* ‘Patna-Gaya Branch Line’ ;  Bankipore to Gaya(Gya) opened 1879;  constructed and worked by State and named [[Patna & Gaya State Railway]]; worked by EIR from 1883 and transferred to EIR 1892; 58 miles(93km). Page 54 (pdf 63) 
* ‘Salanpur Branch Line’ ; Salanpur to Shamdi, 1894-7; 5.5 miles(8.8km). Page 54 (pdf 63) 
* ‘Shikohabad-Farukhabad Branch Line’ ; Shikohabad to Farukhabad, 1905-6; 66 miles(106km). Page 55 (pdf64)
* ‘Tari Ghat Branch Line’; Dildarnager to Tari Ghat, opened 1880 as the [[Dildarnagar-Ghazipur State Railway]]; worked by EIR; transferred to EIR 1892 becoming the EIR ‘Tari Ghat Branch Line’; 12 miles(19km). Page 54 (pdf 63) 
* ‘Tarkessur Branch Line’; [[Sheoraphuli-Tarakeshwar Railway|Sheoraphuli-Tarkessur]] section opened, 1885, constructed by the [[Tarkessur Railway]] Company and worked by EIR, incorporated into EIR 1915 becoming the ‘Tarkessur Branch Line’; 22 miles(35km). Page 54 (pdf 63) 
* ‘Toposi-Barabani Chord’ ; Toposi to Barabani, 1908 and 1915; total 6.5 miles(10.4km). Page 54 (pdf 63) 
* ‘[[Toposi Colliery Branch Lines]]’. Branch lines of railway from Toposi to Kharabad, from Nundi to Paruria, and from Salunpur to Shamdee <ref name=IOR/>  [[Toposi Colliery Branch Lines| ''see separate page'']]
===Branches from the [[First Chord EIR Line]]===
Alphabetical order with page and pdf references from the “1918 Report on Railways” ”  <ref name =Admin/> and IOR source<ref name=IOR/>
* ‘Azimganj Branch Line’;  opened in 1863 as the [[ Nalhati-Azimganj Railway]], a 4ft(1222mm) [[Rail_gauge_#4 foot Gauge|unique rail gauge]] line from Nalhati to Azimganj, constructed and worked by the  [[Indian Branch Railway]]. Lline taken over by the Government  1872 and re-named [[Nalhati State Railway]]; converted to BG in 1892 and becoming the EIR ‘Azimganj Branch Line’ ;  27 miles(43km). Page 55 (pdf64) ,  <ref name=IOR/>.
* ‘Mirza Chowki  Branch Line’; Mirza Chowki to river side, 1909, 0.2 miles(0.3km). Page 55 (pdf64)
* ‘Monghyr Branch Line’; Jamalpur Junction to Monghyr, 1862; 5.7 miles(9.1km)
* ‘Rajmehal Branch Line’; Tinpahar Junction to Rajmehal, 1860; 7 miles(11km). Page 55 (pdf64)
* ‘Sakrigali Branch Line’; Sakriali to River Ganges, 1894, 1.3 miles(2.0km). Page 55 (pdf64)
* ‘Sultangunge Ghat Branch Line’; Sultangunge Junction to Sultangunge Ghat, 1895 1.2 mile(1.9km). Page 55 (pdf64)
===Branches from the [[Grand Chord EIR Line]]===
Alphabetical order with page and pdf references from the “1918 Report on Railways” ”  <ref name =Admin/> and IOR source<ref name=IOR/>
*[[Barun-Daltonganj Railway|’Barun-Daltonganj Branch Line’]]; Sone River East Bank, Barun to Daltonganj, 1902; 78 miles(125km). Page 55 (pdf64)
* ‘Chanch Branch Line’ ; Chanch to Grand Chord Line, 1893-6; 3.9 miles(6.2km). Page 55 (pdf64)
* ‘Damudu  Line’; Kasunda to Pathardihi, 1895-6; 9.8 miles(15.7km). Page 55 (pdf64) [[Jharia Coalfield Railways#Jharia Coalfield EIR Railways|See separate page 'Jharia Coalfield Railways']]
* ‘Jamuniatand Link Line’; Khanoodih to [[Bokharo Colliery Railway]] joint line, 1916; 2 miles(3.2km)
* ‘Jharia Branch Line’; Dhanbaid to Jharia, 1903; 3.8 miles(6km). Page 55 (pdf64) [[Jharia Coalfield Railways#Jharia Coalfield EIR Railways|See separate page 'Jharia Coalfield Railways']]
* ‘Kasunda-Tetulmari Link Line’; Kasunda to Tetulmari, 1906-7; 3.2 miles(5.1km). Page 55(pdf64)
* ‘Katras Branch Line’ ; Dhanbaid to Katrasgarh, 1894; 9.1 miles(14.6km). Page 55 (pdf64) [[Jharia Coalfield Railways#Jharia Coalfield EIR Railways|See separate page 'Jharia Coalfield Railways']]
* ‘Katras-Khanoodih Extension Line’; Katrasgarh to Khanoodih, 1903; 7.2 miles(11.5km). Page 55 (pdf64)
* ‘Katras-Mulkera Cross Connection Line;’ Northern half of connection, 1903, 0.7 miles(1.1km). Page 55 (pdf64)
* ‘Pradhankhanta-Pathardih Chord’; linking  [[Pradhankhanta]] and [[Pathardih]] 9½ miles(15 km), opened in 1913. Page 55 (pdf64) [[Jharia Coalfield Railways#Jharia Coalfield EIR Railways|See separate page 'Jharia Coalfield Railways']]
===BG Lines under Construction or Sanctioned for Construction in 1918===
Alphabetical order with page and pdf references from the “1918 Report on Railways”
*Dhanbad-Katrasgarh Line; Dhanbad to Katrasgarh and beyond, sanctioned 1918; 2.4 miles(3.8km). Page 56 (pdf65)
*Toposi-Baraboni Chord Line; Toposi to Baraboni, sanctioned 1913; 3.7 miles(5.9km). Page 56 (pdf65)
==BG Lines  absorbed into EIR==
Alphabetical order with page and pdf references from the “1918 Report on Railways” <ref name =Admin/>
*[[Barharwa-Azimganj-Katwa Railway]], opened c.1914 as a Branch/Link line from [[Katwa]] on the [[Hooghly-Katwa Railway]] to [[Barharwa]] on the [[Sahibganj Loop EIR Line|Sahibganj Loop]]. This 110 Mile (170km) track was worked by EIR.
*[[Central Indian Coalfields Railway]], opened 1927. [[Government of India |GoI]] owned; part worked by [[Bengal Nagpur Railway]](BNR); later amagamated with EIR.
*[[Delhi-Umballa-Kalka Railway]], formed 1889 as private company, [[Delhi]] to [[Kalka]], line opened 1891, 162 miles(259km), worked and maintained by EIR. Page 60 (pdf68) Until 1925, then by [[North Western Railway]](NWR).
*[[Deoghur Railway]] ; Jasidih to Baidyanathdham, 1882, a short branch line linking important pilgrimage centre to the EIR main line; metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) constructed and worked by [[Burn & Co Ltd]]; merged into EIR, 1911 becoming the ‘Deoghur Branch Line’ of the  [[Howrah-Delhi EIR Main Line]].  4.1 miles(6.6km).  Page 54 (pdf 63) 
*[[Dildarnagar-Ghazipur State Railway]], opened 1880 as a provincial state railway, worked by EIR and later absorbed into the EIR network becoming the Tari Ghat Branch Line of the [[Howrah-Delhi EIR Main Line]]  ; Dildarnager to Tari Ghat, 1880; 12 miles(19km. Page 54 (pdf 63)
*[[Hooghly-Katwa Railway]], opened in 1913 as a  Branch/Link line from [[Bandel]]  on the [[Hooghly]]- [[Burdwan]](Bardhaman) section of the [[Howrah-Delhi EIR Main Line]]. The line linked  to [[Katwa]]where it joined to the [[Barharwa-Azimganj-Katwa Railway]] leading to  [[Barharwa]] on the [[Sahibganj Loop EIR Line|Sahibganj Loop]]. These lines formed part of the EIR network and all were worked by EIR.
*[[Jind-Panipat Railway]], opened 1916 from Jind City , with a connection to the [[Southern Punjab Railway]], to Panipat, worked and maintained by EIR. Total  40.66 miles(65km) comprising 25.90 miles within Jind territory and 14.76 miles in British section. Pages 60-62 (pdf 70-71)
*[[Sheoraphuli-Tarakeshwar Railway]], owned by the [[Tarkessur Railway]] Company ; Sheoraphuli to Tarkessur, opened 1884-85. Worked by EIR and merged into EIR 1915 becoming the ‘Tarkessur Branch Line’ of the [[Howrah-Delhi EIR Main Line]]. 22 miles(35km). Page 54 (pdf 63)
*[[ Nalhati-Azimganj Railway]], opened in 1863 as a 4ft(1222mm) [[Rail_gauge_#4 foot Gauge|unique rail gauge]], constructed and worked by the  [[Indian Branch Railway]]. The line was taken over by the Government in 1872, and renamed the [[Nalhati State Railway]]; converted to BG in 1892 and becoming the ‘Azimganj Branch Line’ of the [[First Chord EIR Line]] ; 27 miles(43km). Page 54 (pdf 63) 
*[[Ondal-Baboissola Railway]], owned by the [[Tarkessur Railway]] Company ; Ondal to Baboissola, opened 1864, 2 miles(3.2km). Worked by EIR and merged into EIR 1915 becoming part of the ’Ondal Loop Line’  of the [[Howrah-Delhi EIR Main Line]] giving total 32 miles(51km). Page 54 (pdf 63) 
*[[Oudh and Rohilkhand Railway]](O&RR), formed from [[Indian Branch Railway]](IBR); nationalised, 1889; merged into EIR, 1925.
*[[South Bihar Railway]], formed 1895 as private company,  [[Luckeeserai]] to [[Gaya]], 79 miles(127km) opened 1899, leased to the State to be worked as part of the EIR network. The railway was taken over by the Government of India([[Government of India |GoI]]) in 1906.
*[[Thanesar-Kaithal Railway]], a branch line of the [[Delhi-Umballa-Kalka Railway]], opened 1909-10, 30 miles(48km) branch from Kurukshetra to Kathal, worked and maintained by EIR up to 1925,Page 60 (pdf68). Then by [[North Western Railway]] from 1926.
== BG Lines - owned and worked by EIR at 1937==
[[File: East_Indian_Railway_System_1937_Map_v3.png| right|600px| EIR Railway System  1937 Map]]
The following are detailed in the 1937 ‘History of Railways’ together with the  map shown<ref name=Hist/>.
<blockquote>1937 Line  Total -  4217 miles(6787km)</blockquote>
=== '''EIR Main Line'''===
Fully opened 1865, 941 miles(1514km) from Howrah to Ghaziabad. The 1918 Report describes  as the [[Howrah-Delhi EIR Main Line| ‘Howrah-Delhi EIR Main Line‘ ''see separate page'']]  but later the final 12½ miles(20km) from Ghaziabad to Delhi was a North Western Railway Line over which EIR had “running powers”.
==='''EIR Loop Line'''===
Fully opened 1862, 253 miles(407km) from Khana Junction to Kjul. [[East_Indian_Railway_-_Lines_owned_and_worked#BG_Lines_-_owned_and_worked_by_EIR|§ The 1918 ‘Administration Report’  detailed above]] described this line as the as the ‘[[Sahibganj Loop EIR Line]]’ 
=== '''[[Grand Chord EIR Line |EIR Grand Chord]]'''===
Fully opened 1900, 275 miles(443km) from Sitarampur to Mogul Sarai. The 1918 Report § gives the line as 278 miles(447km)
==='''[[Howrah-Burdwan Chord Railway]]'''===
Opened 1917, 45 miles(km) from near Howrah to Saktighar
===Branches of the ‘EIR Main Line’ ===
* ‘Tarkessur Branch’, opened 1885, 22 miles(35km) from Sheoraphuli to Tarkessur.  Constructed by [[Tarkessur Railway| Tarkessur Railway Company]]
* ‘Naihati Branch’, opened 1887, 4½ miles(7km) from Bandel Junction to Nalhati
* ‘Bandel-Barharwa Branch’, opened 1911-13,  166 miles(267km) from Bandel Junction to Barharwa
* ‘Sakrigalighat Branch’, opened 1920, 1.2 miles(2km)
* ‘Ondal-Sainthia Chord’, opened 1906, 43 miles(69km) from Ondal to Sainthia
* ‘Bhadreswar Ghat Branch’, opened 1892, 12.6 miles(20km) from Bhadreswar to River Bank
* ‘Kasta Coalfields Branch’, opened 1922, 17 miles(27km) branch to Palasthalai
* ‘Ondal Loop’,  opened in stages, total 25 miles(40km) - 1863-64 from Ondal to Toposi, extended to Gaurangdi in 1894-95, Buktarnagar-Ondal Connexion added  1920
* ‘Toposi-Barabani Chord', opened in stages 1908, 1915 and 1925, total 11 miles(18km)  from Toposi to Barabani
* ‘Ikrah Branch’, opened 1902-04, 15 miles(40km)  from Ikhah Junction to Sitarampur,
* ‘Salanpur Branch’, opened 1894-97, 5½ miles(9km) from Salanput to Shamdi
* ‘Giridh Branch’, opened 1871, 27 miles(43km) from Madhupar Junction to Giridh
* ‘[[Deogur Branch Line]]’ , opened 1882,  4 miles(6km)from Jasidih Junction to Baldyanathdham. [[Deogur Branch Line| -''See separate page for history of this line '']]
* ‘Mokameh Ghat Branch’, opened 1883, 3.7 miles(6km) fromTal Junction, via Mokameh Ghat to Mokameh Junction
* ‘Hathdah Ghat Branch’, opened 1925-26, 1 mile(1.6km) from Hathdah Junction to Hatdah Ghat
* ‘Patna Ghat Branch’, opened 1862, 0.9 miles(1.5km) from Patna to Patna Ghat
* ‘[[Patna-Gaya Branch Line EIR|Patna-Gaya Branch]]’, opened 1879, 58 miles(93km) from Patna Juction to Gaya. ‘[[Patna-Gaya Branch Line EIR|-''See separate page for history of this line '']]
* ‘Digha Ghat Branch’, opened 1885, 5½ miles(9km) from Patna Junction to Digha Ghat, in 1923 a further 1.1 miles(1.8km) added to create ‘the ‘Fair Weather Ghat Line
* ‘Tari Ghat Branch’, opened 1880, 12 miles(35km) from Diarnagar Junction to Tari Ghat. [[Dildarnagar-Ghazipur-Trighat Branch Railway| -''See separate page for history of this line '']]
* ‘Allahabad Fort Branch’, opened 1859, 2.1 miles(3km)
* ‘Cawnpore City Branch’, opened 1879, 0.9 miles(1.5km)
* ‘Shikohabad-Farukhabad Branch’, opened 1905-06, 66 miles(km) from Shikohabad to Farukhabad
* ‘Agra Branch’, opened 1902, 12½ miles from Tundla Juction to Jumna Bridge, the  ‘Agra Direct Connection, 1 mile(1.6km) opened 1 Jan 1908to Agra City
* ‘Hathras Branch’, opened 1897, 6 miles(106km) from Hathras Juction to Hathras Kilah
* ‘Hapur Branch’, opened 1907, 39 miles(63km) from Khurja to Hapur
===Branches of the ‘EIR Loop Line’ ===
* ‘[[Nalhati-Azimganj Railway|Azimganj Branch}]]’, opened 1863, 27 miles(43km) from Nalhati  to Azimganj [[Nalhati-Azimganj Railway -''see separate page for origins of this section'']]
* ‘Rajmehal Branch’, opened 1860, 7 miles(11km) from Tinpahar Juction to Rajmehal
* ‘Bhagalpur-Bausi Branch’, opened 1926, 31 miles(50km) from Bhagalpur to Mandar Hill
* ‘Sultangunge Ghat Branch’, opened 1895, 1.2 miles(2km) from Sultangunge Junction to Sultangunge Ghat
* ‘Monghyr Branch’, opened 1862, 5 miles(8km) from Jamalpur Junction to Monghyr
===Branches of the ‘EIR Grand Chord’ ===
* ‘Chunch Branch’, opened 1903-06, 4 miles(6km) from Chanch block hut to mile 197.30 and between ‘Main Line’ and ‘Grand Choird’ at Sitarampur, 1.3 miles(2km) opened 1910
* ‘Pandra Branch’, opened 1900, 2.7 miles(4km) from Pandra block hut to mile 151.41
* ‘Pradhankhunta-Pathardihi Chord’, opened 1913, 6 miles(10km) from Pradhankhunta to Pathardihi
* ‘Katras Branch’, opened 1891, 9 miles(14km from Dhanbad to Kathrasgarh; extended 1918 2.3 miles(4km) to “beyond”
* ‘Damuda Branch’, opened 1895-96, 9 miles(14km) from Kusunda via Jharia to Pathardihi
* ‘Jheragurah Golucckdih Branch, opened 4 miles(6km), ''route not stated''
* ‘Jharia Branch’, opened 1903, 4 miles(6km) from Dhanbad to Jharia
* ‘Kusunda-Tetulmari Link’, opened 1906-07, 3 miles(5km) from Kusunda toTetulmari, including portion of ‘Chandpur Branch’
* ‘Katras-Khanoodih Extension’, opened  1903, 7 miles(11km) from  Katrasgarh to Khanoodih
* ‘Jamunsaland Link’, opened 1910, 1 mile(1.6km) from ‘Katras-Khanoodih Extension’to the ‘Bokharo Colliery Joint Line’
* ‘Katras Mulkera Cross Connection’, opened 1903, 1 mile(1.6km), northern half of the connection
* ‘Katras Grand Chord Link’, opened 1918, 3 miles(5km), ''route not stated''
* ‘Jhennagurah Branch’, opened 1904, 2 miles(3km), ''route not stated''
* ‘Barun-Daltonganj Branch’, opened 1902, 78 miles(126km) from Sone East Bank at Barun to Daltonganj
* ‘Gomoh Chandrapura Chord’, opened 1927, 10 miles(16km)
* ‘Chandrapura-Barkakana Section’, opened 1915, 12 miles(35km) from Chandrapura to Bermo; extended 1925 to Danca  and Barkana in 1926. Giving a total of 55 miles(90km) all constructed by the [[Bengal-Nagpur Railway]] (BNR) and transferred to EIR Apr 1928
* ‘Barkakana-Daltonganj Section’, opened 1929, 113 miles(182km) from Barkakana-Daltonganj
==='''Northern Main Line''' ===
Former  ‘[[Oudh and Rohilkhand Railway]]’ (O&RR) Main Line, absorbed into EIR 1925. Total line length 520 miles(837km) opened in stages from 1872 to 1893 with the final section connecting to the EIR at Mogul Sarai in 1902
[[Oudh and Rohilkhand Railway| O&RR -''see separate page for all following'']]
* ‘Cawnpore Branch’, opened 1867 and 1875 , 45 miles(89km) from Lucknow to join the EIR at Cawnpore
* ‘Belamau-Madhogan Branch’, opened 1903, 14 miles(23km) from Belamau to Madhogan
* ‘Madhopar-Auhadpur Extension, opened 1909-10, 17 miles(27km) from Madhopar tp Auhadpur
* ‘Belamau-Sitapur Branch’, opened 1910, 37 miles(60km) from Belamau to Sitapur
* ‘Chandpur-Bijnor-Muazzampur- Narain Branch’, opened 1930, 37 miles(60km) , ''route not stated''
* ‘Rosa-Sitapur Branch’, opened 1910-14, 53 miles(85km) from Rosa to Sitapur City and Sitapur Cantonment
* ‘Moradabad-Ghaziabad Branch’, opened 1900, 87 miles(140km)  from Moradabad to Ghaziabad
* ‘Hapar-Meerut Branch’, opened 1904, 18 miles(45km) from Hapar to Meerut
* ‘Kotdwara Branch’, opened 1896, 15 miles(24km) from Najibabad Junction to the right hand side of Kob River opposite Kotdwara
* ‘Hardwar Branch’ , opened 1886, 17 miles(43km) from Lhnaksar Junction to left bank of Ganges Canal near Jawalapur and on to Hardwar
* ‘Rikhikesh Branch’, opened 1927, 7 miles(11km) from Raiwala to Rikhikesh
=== ''' Benares-Lucknow Loop''' ===
Former [[O&RR]] Loop, opened 1872-74, 199 miles(320km) [[Oudh and Rohilkhand Railway| O&RR -''see separate page'']]
<br>[[Oudh and Rohilkhand Railway| O&RR Branches -''see separate page for all following'']]
* ‘Allahabad-Fyzabad branch’, opened 1904-05, 92 miles(148km) from Allahabad via Sultanpur to Fyzabad
* ‘Allahabad-Jaunpur Branch’, opened 1906-07, 58 miles(109km) from Phaphamau to Zafarabad
* ‘Bahramghat Branch’, opened 1872, 21 miles(34km), Bara Banki to Bahramghat
=== ‘Benares-Moradabad Loop’ ===
Former {{O&RR]] Loop, opened 1872-73, 70 miles(113km) [[Oudh and Rohilkhand Railway| O&RR -''see separate page'']]
<br>[[Oudh and Rohilkhand Railway| O&RR -''see separate page for all following'']]
* ‘Aligarh Branch’, opened 1872, 61 miles(114km) from Chandauni to Aligarh
* ‘Allahabad-Rae Bareli-Cawnpore Branch’, opened 1911-12,  153 miles(246km) from Phaphamau via Rae Bareli to Unao. The line was dismantled during WW1 and reopened 1927
* ‘Gajroula-Chandpur Siau Branch’, opened 1911-12, 21 miles(34km) from Gajroula to Chandpur Siau
* ‘Raja-ka-Saharapur to Sambal Hatim Sarai Section’, opened 1912, 14 miles(23km). The line was dismantled during WW1 and reopened 1922
* ‘Akbarpur-Tanda Branch’, opened 1912, 11 miles(18km), from Akbarpur toTanda
*[[Calcutta Chord Railway]], opened 1932, 8 miles(14km). EIR link from Dum Dum to Dankuni over [[Willindon Bridge]]
* ‘Lucknow-Sultanpur-Zafarabad Branch’, opened 1931-32, 136 miles(219km) from Lucknow via Sultanpur to Zafarabad
* ‘Unao-Madhoganj Branch’, opened 1930, 48 miles(77km) from Unao to Madhoganj
==BG Lines worked by EIR at some time==
*[[Jind-Panipat Railway]], opened 1916-17. Originally worked by EIR; later by [[North Western Railway]](NWR)
*[[Calcutta Port Commissioners' Railway]], opened 1892 and connected to EIR in 1924
== References ==
<references />
[[Category:Railways]]

Latest revision as of 17:57, 30 December 2020