Moghal Sarai-Howrah Railway Survey: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Created page with "'''Moghal Sarai-Howrah Railway Survey''' Under survey 1988 and 1890 No evidence that..."
 
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed, References added
Line 1: Line 1:
'''Moghal Sarai-Howrah Railway Survey'''
The '''Moghal Sarai-Howrah Railway Survey''' was undertaken from 1889 to 1890 by a team of Engineers from the Public Works Department. 
<ref>India Civil List 1890 PWD Railways</ref>


Under survey 1988 and 1890                                                                                        
It has not been possible to determine if this plan was adopted either in part, or completely.                                                                                        


No evidence that this was proceeded with.
The Engineer-in-Chief was Horace Bell who "in February, 1889, was posted in a similar capacity to the Moghal Serai Railway Survey."
<ref>[http://www.forgottenbooks.com/readbook_text/Minutes_of_Proceedings_1903_1000771908/329] Forgotten Books - Minutes of Proceedings of the Institution of Civil Engineers 1913, pages 320-1</ref>


 
== References ==
{{Work-in-Progress-Rly}}
<references />


[[Category:Railway Surveys]]
[[Category:Railway Surveys]]
[[Category:Railways]]
[[Category:Railways]]

Revision as of 05:32, 27 November 2015

The Moghal Sarai-Howrah Railway Survey was undertaken from 1889 to 1890 by a team of Engineers from the Public Works Department. [1]

It has not been possible to determine if this plan was adopted either in part, or completely.

The Engineer-in-Chief was Horace Bell who "in February, 1889, was posted in a similar capacity to the Moghal Serai Railway Survey." [2]

References

  1. India Civil List 1890 PWD Railways
  2. [1] Forgotten Books - Minutes of Proceedings of the Institution of Civil Engineers 1913, pages 320-1