Difference between revisions of "Shoranur-Nalambur Railway"
Jump to navigation
Jump to search
m |
(Data added, links checked, Work-in-progress removed, References added) |
||
Line 1: | Line 1: | ||
− | '''Shoranur-Nalambur Railway''' | + | The '''Shoranur-Nalambur Railway''' was a branch line of the [[South Indian Railway]](SIR), a single line broad gauge([[Rail_gauge#Broad_Gauge|BG]]) railway of 41 miles(66 km) length running from [[Shoranur]] Junction to [[Nalambur]] |
+ | The line was opened in 1927 in stages: from Shoranur to Angadipuram on 3 February, on to Vaniyambalam on 3 August, reaching Nalambur on 26 October. | ||
+ | <ref>[http://en.wikipedia.org/wiki/Nilambur%E2%80%93Shoranur_railway_line] Wikipedia</ref> | ||
− | + | == References == | |
− | + | <references /> | |
− | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] | [[Category:State Railways]] |
Revision as of 06:08, 5 December 2015
The Shoranur-Nalambur Railway was a branch line of the South Indian Railway(SIR), a single line broad gauge(BG) railway of 41 miles(66 km) length running from Shoranur Junction to Nalambur The line was opened in 1927 in stages: from Shoranur to Angadipuram on 3 February, on to Vaniyambalam on 3 August, reaching Nalambur on 26 October. [1]