Shoranur-Nalambur Railway: Difference between revisions
Jump to navigation
Jump to search
Data added, links checked, Work-in-progress removed, References added |
References format corrected |
||
Line 1: | Line 1: | ||
The '''Shoranur-Nalambur Railway''' was a branch line of the [[South Indian Railway]](SIR), a single line broad gauge([[Rail_gauge#Broad_Gauge|BG]]) railway of 41 miles(66 km) length running from [[Shoranur]] Junction to [[Nalambur]] | The '''Shoranur-Nalambur Railway''' was a branch line of the [[South Indian Railway]](SIR), a single line broad gauge([[Rail_gauge#Broad_Gauge|BG]]) railway of 41 miles(66 km) length running from [[Shoranur]] Junction to [[Nalambur]] | ||
The line was opened in 1927 in stages: from Shoranur to Angadipuram on 3 February, on to Vaniyambalam on 3 August, reaching Nalambur on 26 October. | The line was opened in 1927 in stages: from Shoranur to Angadipuram on 3 February, on to Vaniyambalam on 3 August, reaching Nalambur on 26 October. | ||
<ref>[http://en.wikipedia.org/wiki/Nilambur%E2%80%93Shoranur_railway_line] | <ref>[http://en.wikipedia.org/wiki/Nilambur%E2%80%93Shoranur_railway_line Wikipedia "Nilambur Shoranur railway line]; Retrieved 13 Dec 2015</ref> | ||
== References == | == References == |
Revision as of 16:18, 13 December 2015
The Shoranur-Nalambur Railway was a branch line of the South Indian Railway(SIR), a single line broad gauge(BG) railway of 41 miles(66 km) length running from Shoranur Junction to Nalambur The line was opened in 1927 in stages: from Shoranur to Angadipuram on 3 February, on to Vaniyambalam on 3 August, reaching Nalambur on 26 October. [1]
References
- ↑ Wikipedia "Nilambur Shoranur railway line; Retrieved 13 Dec 2015