Ranaghat-Bhagwangola Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
New page - links tested
 
PEA-2292 (talk | contribs)
Reference to dsal.uchicago. removed - unable to establish http/ link
Line 1: Line 1:
The [[Ranaghat-Bhagwangola Railway]] opened in 1884 as a branch of the [[East Bengal Railway]](EBR).
The [[Ranaghat-Bhagwangola Railway]] opened in 1884 as a branch of the [[East Bengal Railway]](EBR).
<ref>No 68 Capital Railway Expenditure in India on Railways 1882-8".  See dsal.uchicago.edu/statistics/1876.../1876.068.XLS;</ref>


The name of the branch changed as the line progressed
The name of the branch changed as the line progressed

Revision as of 07:57, 1 January 2016

The Ranaghat-Bhagwangola Railway opened in 1884 as a branch of the East Bengal Railway(EBR).

The name of the branch changed as the line progressed

The branch ran from the EBR mainline at Ranaghat, via Bhagwangola and Murshidabad, to the terminus at Lalgola Ghat on the River Ganges. [2]

References