Ahmedabad-Parantij Railway: Difference between revisions
Jump to navigation
Jump to search
1918 Admin Report details checked/added/corrected |
Mileage 1905 added |
||
Line 4: | Line 4: | ||
|route= [[Ahmedabad]] to [[Parantij]] | |route= [[Ahmedabad]] to [[Parantij]] | ||
|gauge1= Metre gauge | |gauge1= Metre gauge | ||
|gauge1details= | |gauge1details= 55 miles(1905) | ||
|gauge2= | |gauge2= | ||
|gauge2details= | |gauge2details= |
Revision as of 13:42, 3 January 2016
Ahmedabad-Parantij Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Ahmedabad to Parantij | ||
Gauge / mileage | ||
Metre gauge | 55 miles(1905) | |
Timeline | ||
1896 | Formed | |
1897 | Opened to traffic | |
Key locations | ||
Presidency | Bombay | |
Stations | ||
System agency | ||
Worked by Bombay, Baroda and Central India Railway | ||
How to interpret this infobox |
A metre gauge(MG) branch of the Bombay, Baroda and Central India Railway. [1]