Broach-Jambusar Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
1918 Admin Report details checked/added/corrected
PEA-2292 (talk | contribs)
mNo edit summary
Line 6: Line 6:


The line was finally opened as a branch of the BB&CIR network in 1914-15  
The line was finally opened as a branch of the BB&CIR network in 1914-15  
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 35]; Retrieved 17 Dec 2015</ref>
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 35]; Retrieved 17 Dec 2015</ref>



Revision as of 07:02, 17 December 2015

Broach-Jambusar Railway

The connection of Broach to Jambusar to transport cotton from Jambusar to the Bombay, Baroda and Central India Railway(BB&CIR) at Broach was first considered by the Baroda Durbar as a 2ft 6in/762mm narrow gauge(NG) branch of the Gaekwar's Baroda State Railway but the project was abandoned. [1] [2]

The line was finally opened as a branch of the BB&CIR network in 1914-15 [3]

References