Manamadura-Sivaganga Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
1918 Admin Report details checked/added/corrected - new page
 
PEA-2292 (talk | contribs)
mNo edit summary
 
Line 2: Line 2:


“Sanction to the construction of this line by the [[South Indian Railway]]  Company(SIR) on behalf of the District Board of Ramnad was conveyed .. on  2nd December 1915, but the commencement of work has been postponed owing to the present abnormal conditions arising out of the war”.
“Sanction to the construction of this line by the [[South Indian Railway]]  Company(SIR) on behalf of the District Board of Ramnad was conveyed .. on  2nd December 1915, but the commencement of work has been postponed owing to the present abnormal conditions arising out of the war”.
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page ]; Retrieved 19 Dec 2015</ref>
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 159]; Retrieved 19 Dec 2015</ref>


The proposed metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line from [[Manamadura]] to [[Sivaganga]] would be 12 miles(19km); and it is not clear if this section of the SIR network was ever completed until 2008 when a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) link was established..
The proposed metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line from [[Manamadura]] to [[Sivaganga]] would be 12 miles(19km); and it is not clear if this section of the SIR network was ever completed until 2008 when a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) link was established..

Latest revision as of 11:09, 19 December 2015

Manamadura-Sivaganga Railway

“Sanction to the construction of this line by the South Indian Railway Company(SIR) on behalf of the District Board of Ramnad was conveyed .. on 2nd December 1915, but the commencement of work has been postponed owing to the present abnormal conditions arising out of the war”. [1]

The proposed metre gauge(MG) line from Manamadura to Sivaganga would be 12 miles(19km); and it is not clear if this section of the SIR network was ever completed until 2008 when a broad gauge(BG) link was established..

References