Gaekwar's Petlad Railway: Difference between revisions
Jump to navigation
Jump to search
Princley State link added |
IRFCA References moved to External Links to confirm to specified format |
||
Line 1: | Line 1: | ||
The '''Gaekwar's Petlad Railway''' was opened in 1896 between [[Petlad]] and [[Anand]], a distance of 13 miles(21km). It was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line and worked by Bombay, Baroda and Central India Railway(BB&CIR). | The '''Gaekwar's Petlad Railway''' was opened in 1896 between [[Petlad]] and [[Anand]], a distance of 13 miles(21km). It was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line and worked by Bombay, Baroda and Central India Railway(BB&CIR). | ||
<ref>[https://books.google.co.uk/books?id=3VQTAAAAYAAJ&pg=PA412&lpg=PA412&dq=Petlad-Cambay+Railway&source=bl&ots=eoKF25izT3&sig=dusWgQ1um3G5MMaRpx5OckIsNc0&hl=fr&sa=X&ved=0CFkQ6AEwCWoVChMIlcSyyquayQIVgSwPCh21sgX2#v=onepage&q=Petlad&f=false "The India List and India Office List 1905"]; Retrieved 11 Dec 2015</ref> | <ref>[https://books.google.co.uk/books?id=3VQTAAAAYAAJ&pg=PA412&lpg=PA412&dq=Petlad-Cambay+Railway&source=bl&ots=eoKF25izT3&sig=dusWgQ1um3G5MMaRpx5OckIsNc0&hl=fr&sa=X&ved=0CFkQ6AEwCWoVChMIlcSyyquayQIVgSwPCh21sgX2#v=onepage&q=Petlad&f=false "The India List and India Office List 1905"]; Retrieved 11 Dec 2015</ref> | ||
The railway was owned by by the [[Princely states|Princely ]][[Baroda State]]. | The railway was owned by by the [[Princely states|Princely ]][[Baroda State]]. | ||
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 19]; Retrieved 5 Jan 2016</ref> | <ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 19]; Retrieved 5 Jan 2016</ref> | ||
Line 7: | Line 7: | ||
In 1901 extensions were added bringing the track length to 32 miles(51km) and the entire line was worked by BB&CIR. At about this time it apparently became the '''[[Petlad-Cambay Railway]]''' | In 1901 extensions were added bringing the track length to 32 miles(51km) and the entire line was worked by BB&CIR. At about this time it apparently became the '''[[Petlad-Cambay Railway]]''' | ||
Later it was worked by [[Gaekwar's Baroda State Railway]](GBSR) | Later it was worked by [[Gaekwar's Baroda State Railway]](GBSR) | ||
==External Links== | |||
*[http://www.irfca.org/docs/19century-routes.html "Railway Network Sizes in 1891 and 1895"] IRFCA "Indian Railways Fan Club" | |||
== References == | == References == |
Revision as of 16:24, 13 January 2016
The Gaekwar's Petlad Railway was opened in 1896 between Petlad and Anand, a distance of 13 miles(21km). It was a broad gauge(BG) line and worked by Bombay, Baroda and Central India Railway(BB&CIR). [1]
The railway was owned by by the Princely Baroda State. [2]
In 1901 extensions were added bringing the track length to 32 miles(51km) and the entire line was worked by BB&CIR. At about this time it apparently became the Petlad-Cambay Railway Later it was worked by Gaekwar's Baroda State Railway(GBSR)
External Links
- "Railway Network Sizes in 1891 and 1895" IRFCA "Indian Railways Fan Club"
References
- ↑ "The India List and India Office List 1905"; Retrieved 11 Dec 2015
- ↑ " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 19; Retrieved 5 Jan 2016