The Families In British India Society (FIBIS) is a self-help organisation devoted to members researching their British India family history and the background against which their ancestors led their lives in India under British rule. Let FIBIS help you break down those brick walls in your research |
Great Southern of India Railway: Difference between revisions
Jump to navigation
Jump to search
‘Personnel’ moved from opening section and Dibblee added |
→History: 1870/71 Report and internal link added |
||
Line 42: | Line 42: | ||
In 1868, the GSIR line reached [[Erode]], connecting to the [[Madras Railway]] and [[David Logan]] was reappointed as Chief Engineer. "The GSIR was at that time a 5-foot 6-inch gauge line, extending from Negapatam to Erode. Its subsequent development into the system now known as the [[South Indian Railway]], about 1,100 miles in length, was carried out under Mr. Logan's direction."<ref name=Logan>[http://www.gracesguide.co.uk/David_Logan Grace’s Guide "David Logan"]; Retrieved on 19 Jun 2016</ref>. | In 1868, the GSIR line reached [[Erode]], connecting to the [[Madras Railway]] and [[David Logan]] was reappointed as Chief Engineer. "The GSIR was at that time a 5-foot 6-inch gauge line, extending from Negapatam to Erode. Its subsequent development into the system now known as the [[South Indian Railway]], about 1,100 miles in length, was carried out under Mr. Logan's direction."<ref name=Logan>[http://www.gracesguide.co.uk/David_Logan Grace’s Guide "David Logan"]; Retrieved on 19 Jun 2016</ref>. | ||
The [[1870-71_Report_on_Railways#Progress_on_State_lines._Paragraphs_5-10.3B_Pages_3-4| “1870-71 Annual Report for Indian Railways for the Great Southern of India Railway “]] gives:- [[Rail_gauge#Broad_Gauge|‘Broad Gauge (BG)]] Line sanctioned 378 miles(608km), with total Line length 168 miles(270km) and 210 miles(338km) to be finished’. The Report also details the [[1870-71_Report_on_Railways#Great_Southern_of_India_Railway._Paragraphs_73-75.3B_Page_36|‘progress of the railway and the commercial summery’]] - ''see separate pages for Report details.'' | |||
On 1st July 1874 the Great Southern of India Railway Company and the [[Carnatic Railway]], were amalgamated under the title of the '''[[South Indian Railway]]''' (SIR). <br>These broad gauge([[Rail_gauge#Broad_Gauge|BG]]) lines were later(1875) converted to metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) to become part of the [[Madras-Tuticorin Mainline|'''SIR Madras-Tuticorin Mainline''' MG network - ''see separate page'']]. | On 1st July 1874 the Great Southern of India Railway Company and the [[Carnatic Railway]], were amalgamated under the title of the '''[[South Indian Railway]]''' (SIR). <br>These broad gauge([[Rail_gauge#Broad_Gauge|BG]]) lines were later(1875) converted to metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) to become part of the [[Madras-Tuticorin Mainline|'''SIR Madras-Tuticorin Mainline''' MG network - ''see separate page'']]. |