Tirutturaipundi -Point Calimere Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Created page with "‘Tirutturaipundi -Point Calimere Railway’, 28 miles(45km), opened 1919 from Tirutturaipundi to Agastiyampalli, 23 miles(37km) and extended a further 5 miles(8km) to Po..."
 
PEA-2292 (talk | contribs)
mNo edit summary
 
Line 1: Line 1:
‘[[Tirutturaipundi -Point Calimere Railway]]’, 28 miles(45km), opened 1919 from Tirutturaipundi to Agastiyampalli, 23 miles(37km) and extended a further 5 miles(8km) to Point Calimere in 1930
‘[[Tirutturaipundi -Point Calimere Railway]]’, 28 miles(45km), opened 1919 from Tirutturaipundi to Agastiyampalli, 23 miles(37km) and extended a further 5 miles(8km) to Point Calimere in 1930. Part of the ‘[[South Indian Railway]] ‘SIR Metre Gauge’
<ref name=Hist196>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ pages 196-197, pdf  239-240]; Retrieved  2 Oct 2020</ref>
<ref name=Hist196>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ pages 196-197, pdf  239-240]; Retrieved  2 Oct 2020</ref>
   
   

Latest revision as of 15:10, 8 October 2020

Tirutturaipundi -Point Calimere Railway’, 28 miles(45km), opened 1919 from Tirutturaipundi to Agastiyampalli, 23 miles(37km) and extended a further 5 miles(8km) to Point Calimere in 1930. Part of the ‘South Indian Railway ‘SIR Metre Gauge’ [1]

Further Informaion

See separate page SIR Metre Gauge

References