Mayavaram Mutupet Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed, References added
Line 1: Line 1:
'''Mayavaram Mutupet Railway'''
The '''Mayavaram Mutupet Railway''' opened with a section of  31 miles (50km) in 1890 and completed in 1894.


Worked by SIR(qv), 1897
The line was owned by [[Tanjore District Board]] and worked by the [[South Indian Railway]](SIR)
 
<ref>[https://archive.org/stream/illustratedguid00ltdgoog#page/n131/mode/2up/search/Mayavaram+Mutupet] Illustrated guide to the South Indian Railway, including the Mayavaram-Mutupet, and Peralam-Karaikkal railways by South Indian Railway Co., Ltd. Published 1900. </ref>
{{Work-in-Progress-Rly}}
<ref>[http://paperspast.natlib.govt.nz/cgi-bin/paperspast?a=d&d=EP18910815.2.75] Evening Post, Volume XLII, Issue 40, 15 August 1891, Page 2 </ref>


== References ==
<references />
[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]
[[Category:District Railway Boards‎]]

Revision as of 15:52, 26 November 2015

The Mayavaram Mutupet Railway opened with a section of 31 miles (50km) in 1890 and completed in 1894.

The line was owned by Tanjore District Board and worked by the South Indian Railway(SIR) [1] [2]

References

  1. [1] Illustrated guide to the South Indian Railway, including the Mayavaram-Mutupet, and Peralam-Karaikkal railways by South Indian Railway Co., Ltd. Published 1900.
  2. [2] Evening Post, Volume XLII, Issue 40, 15 August 1891, Page 2