Shoranur-Nalambur Railway: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
Data added, links checked, Work-in-progress removed, References added |
||
Line 1: | Line 1: | ||
'''Shoranur-Nalambur Railway''' | The '''Shoranur-Nalambur Railway''' was a branch line of the [[South Indian Railway]](SIR), a single line broad gauge([[Rail_gauge#Broad_Gauge|BG]]) railway of 41 miles(66 km) length running from [[Shoranur]] Junction to [[Nalambur]] | ||
The line was opened in 1927 in stages: from Shoranur to Angadipuram on 3 February, on to Vaniyambalam on 3 August, reaching Nalambur on 26 October. | |||
<ref>[http://en.wikipedia.org/wiki/Nilambur%E2%80%93Shoranur_railway_line] Wikipedia</ref> | |||
== References == | |||
<references /> | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] | [[Category:State Railways]] |
Revision as of 06:08, 5 December 2015
The Shoranur-Nalambur Railway was a branch line of the South Indian Railway(SIR), a single line broad gauge(BG) railway of 41 miles(66 km) length running from Shoranur Junction to Nalambur The line was opened in 1927 in stages: from Shoranur to Angadipuram on 3 February, on to Vaniyambalam on 3 August, reaching Nalambur on 26 October. [1]