Difference between revisions of "Tilhar-Budaun-Hapur Railway Survey"

From FIBIwiki
Jump to navigation Jump to search
m
(Data added, Work-in-progress removed)
 
Line 1: Line 1:
'''Tilhar-Budaun-Hapur Railway Survey'''
+
The '''Tilhar-Budaun-Hapur Railway Survey''' was undertaken by the [[Oudh and Rohilkhand Railway]](O&RR) in 1909.
Under survey by [[Oudh and Rohilkhand Railway]](O&RR),1909 . Ref Civil List 1909 page 379 – Railways  O&RR -  unable to determine if constructed.
+
<ref>Civil List 1909 page 379 – Railways  O&RR</ref>
  
 +
''It has not been possible to determine if constructed.''
  
{{Work-in-Progress-Rly}}
+
 
 +
== References ==
 +
<references />
  
  
 
[[Category:Railway Surveys]]
 
[[Category:Railway Surveys]]
 
[[Category:Railways]]
 
[[Category:Railways]]

Latest revision as of 08:00, 7 December 2015

The Tilhar-Budaun-Hapur Railway Survey was undertaken by the Oudh and Rohilkhand Railway(O&RR) in 1909. [1]

It has not been possible to determine if constructed.


References

  1. Civil List 1909 page 379 – Railways O&RR