Chaparmukh Silghat Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
1918 Admin Report details checked/added/corrected
PEA-2292 (talk | contribs)
mNo edit summary
Line 1: Line 1:
The '''Chaparmukh-Silghat Railway''' was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) branch line, worked by [[Assam-Bengal Railway]](ABR). The line between [[Chaparmukh]] and [[Silghat]] , a distance of 50 miles(80km) was sanctioned for construction in October 1915.
The '''Chaparmukh-Silghat Railway''' was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) branch line, worked by [[Assam-Bengal Railway]](ABR). The line between [[Chaparmukh]] and [[Silghat]] , a distance of 50 miles(80km) was sanctioned for construction in October 1915.
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page  ]; Retrieved 17 Dec 2015</ref>
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page  ]; Retrieved 17 Dec 2015</ref>
The line was in use by 1919.
The line was in use by 1919.



Revision as of 14:15, 17 December 2015

The Chaparmukh-Silghat Railway was a broad gauge(BG) branch line, worked by Assam-Bengal Railway(ABR). The line between Chaparmukh and Silghat , a distance of 50 miles(80km) was sanctioned for construction in October 1915. [1]

The line was in use by 1919.

References