Howrah-Burdwan Chord Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Reference added and additional text
PEA-2292 (talk | contribs)
Fully checked; Further Info added with link
Line 4: Line 4:
The broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line, length 55 miles(87km) from [[Lillooah]] station, 4 miles from [[Howrah]] to relieve the heavily worked section of the EIR network to [[Burdwan]]     
The broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line, length 55 miles(87km) from [[Lillooah]] station, 4 miles from [[Howrah]] to relieve the heavily worked section of the EIR network to [[Burdwan]]     
<ref>[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/18185/GIPE-015962.pdf?sequence=3&isAllowed=y “Administration Report on the Railways in India 1916” page 12]; Retrieved 27 Dec 2015</ref>
<ref>[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/18185/GIPE-015962.pdf?sequence=3&isAllowed=y “Administration Report on the Railways in India 1916” page 12]; Retrieved 27 Dec 2015</ref>
==Further Information==
See '''[[East Indian Railway]]'''


== References ==
== References ==

Revision as of 06:58, 5 February 2016

The Howrah-Burdwan Chord Railway was part of East Indian Railway(EIR) system. The line opened in 1917 and provided shorter link to Burdwan from the EIR hub at Howrah. Prior to the opening of the Howrah-Burdwan chord the only line was the Sheoraphuli-Tarakeshwar Railway which had been constructed in 1885. [1]

The broad gauge(BG) line, length 55 miles(87km) from Lillooah station, 4 miles from Howrah to relieve the heavily worked section of the EIR network to Burdwan [2]

Further Information

See East Indian Railway

References