Difference between revisions of "Chhindwara-Pench Coal Fields Railway"

From FIBIwiki
Jump to navigation Jump to search
(Fully checked; Additional text and "Reference"; Further Info added with link)
(Redirect created to Pench Valley Coalfield Railway)
Line 1: Line 1:
The '''Chhindwara-Pench Coal Fields Railway''' opened in 1906-7 to connect the Pench coalfield with the by [[Bengal-Nagpur Railway]](BNR)  network at [[Chhindwara]] . The line was  2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) with a length of  22 miles(36km).
+
#REDIRECT [[Pench Valley Coalfield Railway]]
<ref> [https://books.google.fr/books?id=nkPUnn3HiZoC&pg=PA159&lpg=PA159&dq=Chhindwara-Pench+Coal+Fields+Railway&source=bl&ots=py14e9ydQk&sig=bQxL8BQhrO5cc1Lny_LEzhlQZh4&hl=fr&sa=X&ved=0ahUKEwisl8Wm-9XKAhWCgBoKHcJjA_0Q6AEIRzAH#v=onepage&q=Chhindwara-Pench%20Coal%20Fields%20Railway&f=false Google Books ‘Spatial Framework and Economic Development: A Geographical Perspective’  page 159; by  Shri Kamal Sharma ] Retrieved on  1 Feb 2016</ref>
 
 
 
The railway was worked by  [[Bengal-Nagpur Railway]](BNR) as part of [[Satpura Railway]] Narrow Gauge network.
 
 
 
==Further Information==
 
See '''[[Bengal-Nagpur Railway]]''' and '''[[Satpura Railway]]'''
 
 
 
== References ==
 
<references />
 
  
 
[[Category:Railways]]
 
[[Category:Railways]]
[[Category:State Railways]]
 

Revision as of 14:15, 10 February 2016