Champaner-Shivrajpur- Pani Light Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Fully checked; 1918 Admin Report link changed, IRFCA link deleted
PEA-2292 (talk | contribs)
Infobox added and rewrite,'Further Information added;text changes
Line 1: Line 1:
The '''Champaner-Shivrajpur-Pani Light Railway''' was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway, opened in 1911 and extended up to 1916, a total of 31 miles(49km); it was served from [[Halol]].
{{Line Railways Infobox
<ref>[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/18185/GIPE-015962.pdf?sequence=3&isAllowed=y  "Railways in India – GOI Administrative Report 1916-17" page 13]; Retrieved 27 Dec 2015</ref>  
|image=
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n230/mode/2up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing,  Calcutta;  page 222]; Retrieved 1 Feb 2016</ref>
|caption=
|route= [[Champaner]] to [[Shivrapur]]
|gauge1= 2ft 6in NG
|gauge1details=  31 miles (1916)
|gauge2= 
|gauge2details=
|gauge3=
|gauge3details=
|gauge4=
|gauge4details=
|timeline1date= 1911
|timeline1details=  [[Champaner]] to [[Shivrapur]] section opened
|timeline2date=  1915-16
|timeline2details=  [[Shivrapur]] to [[Pani]] opened in stages
|timeline3date=  1915
|timeline3details=  Line transferred to the [[Guzerat Railway Company| Guzerat Railways Company]]
|timeline4date= 1922
|timeline4details= Company taken over by the [[Bombay, Baroda and Central India Railway]]
|timeline5date=
|timeline5details= 
|presidency= [[Bombay (Presidency)|Bombay]]
|stations= [[Champaner]], [[Shivrapur]], [[Pani]]  
|system1date= 1911
|system1details= Worked by[[Guzerat Railway Company| Guzerat Railways Company]]
|system2date= 1915
|system2details= Owned and worked by[[Guzerat Railway Company|Guzerat Railways Company]]
|system3date= 1922
|system3details= Company taken over by BB&CIR
}}


Owned and managed by the [[Guzerat Railway Company]]; worked by [[Bombay, Baroda and Central India Railway]](BB&CIR).
The '''Champaner-Shivrajpur-Pani Light Railway''' was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway and was served from [[Halol]].  Constructed for the Shivrajpur Syndicate Ltd of Bombay <ref name=name> [https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n230/mode/2up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 222]; Retrieved 21 Feb 2016</ref>
‘to afford railway communication to the Manganese Mines at Pani ...;  the work of construction has been carried out by the Guzerat Railways Company who will undertake its working’
<ref>[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/18185/GIPE-015962.pdf?sequence=3&isAllowed=y  "Railways in India – GOI Administrative Report 1916-17" page 13]; Retrieved 21 Feb 2016</ref>.


Taken over by BB&CIR in 1922.
The first section, 17 miles(27km), opened in 1911 from [[Champaner]] Road to [[Shivrapur]] with a 1.7 mile branch to Shivrapur Mines.  The line was transferred to the Guzerat Railways Company from Apr 1915 and the line extended to [[Pani]] in 1916, a total of 31 miles(49km) <ref name=name/>.
 
The railway was then owned and managed by the [[Guzerat Railway Company| Guzerat Railways Company]] and in 1922 the company was taken over by the [[Bombay, Baroda and Central India Railway]](BB&CIR).
 
==Further Information==
See '''[[Guzerat Railway Company| Guzerat Railways Company]]''' until 1922, then the '''[[Bombay, Baroda and Central India Railway]]'''


== References ==
== References ==

Revision as of 17:31, 21 February 2016

Champaner-Shivrajpur- Pani Light Railway
[[Image:|150px| ]]
Line of route
Champaner to Shivrapur
Gauge / mileage
2ft 6in NG 31 miles (1916)
Timeline
1911 Champaner to Shivrapur section opened
1915-16 Shivrapur to Pani opened in stages
1915 Line transferred to the Guzerat Railways Company
1922 Company taken over by the Bombay, Baroda and Central India Railway
Key locations
Presidency Bombay
Stations Champaner, Shivrapur, Pani
System agency
1911 Worked by Guzerat Railways Company
1915 Owned and worked byGuzerat Railways Company
1922 Company taken over by BB&CIR
How to interpret this infobox

The Champaner-Shivrajpur-Pani Light Railway was a 2ft 6in/762mm narrow gauge(NG) railway and was served from Halol. Constructed for the Shivrajpur Syndicate Ltd of Bombay [1] ‘to afford railway communication to the Manganese Mines at Pani ...; the work of construction has been carried out by the Guzerat Railways Company who will undertake its working’ [2].

The first section, 17 miles(27km), opened in 1911 from Champaner Road to Shivrapur with a 1.7 mile branch to Shivrapur Mines. The line was transferred to the Guzerat Railways Company from Apr 1915 and the line extended to Pani in 1916, a total of 31 miles(49km) [1].

The railway was then owned and managed by the Guzerat Railways Company and in 1922 the company was taken over by the Bombay, Baroda and Central India Railway(BB&CIR).

Further Information

See Guzerat Railways Company until 1922, then the Bombay, Baroda and Central India Railway

References