Champaner-Shivrajpur- Pani Light Railway: Difference between revisions
Fully checked; 1918 Admin Report link changed, IRFCA link deleted |
Infobox added and rewrite,'Further Information added;text changes |
||
Line 1: | Line 1: | ||
{{Line Railways Infobox | |||
|image= | |||
|caption= | |||
|route= [[Champaner]] to [[Shivrapur]] | |||
|gauge1= 2ft 6in NG | |||
|gauge1details= 31 miles (1916) | |||
|gauge2= | |||
|gauge2details= | |||
|gauge3= | |||
|gauge3details= | |||
|gauge4= | |||
|gauge4details= | |||
|timeline1date= 1911 | |||
|timeline1details= [[Champaner]] to [[Shivrapur]] section opened | |||
|timeline2date= 1915-16 | |||
|timeline2details= [[Shivrapur]] to [[Pani]] opened in stages | |||
|timeline3date= 1915 | |||
|timeline3details= Line transferred to the [[Guzerat Railway Company| Guzerat Railways Company]] | |||
|timeline4date= 1922 | |||
|timeline4details= Company taken over by the [[Bombay, Baroda and Central India Railway]] | |||
|timeline5date= | |||
|timeline5details= | |||
|presidency= [[Bombay (Presidency)|Bombay]] | |||
|stations= [[Champaner]], [[Shivrapur]], [[Pani]] | |||
|system1date= 1911 | |||
|system1details= Worked by[[Guzerat Railway Company| Guzerat Railways Company]] | |||
|system2date= 1915 | |||
|system2details= Owned and worked by[[Guzerat Railway Company|Guzerat Railways Company]] | |||
|system3date= 1922 | |||
|system3details= Company taken over by BB&CIR | |||
}} | |||
The '''Champaner-Shivrajpur-Pani Light Railway''' was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway and was served from [[Halol]]. Constructed for the Shivrajpur Syndicate Ltd of Bombay <ref name=name> [https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n230/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 222]; Retrieved 21 Feb 2016</ref> | |||
‘to afford railway communication to the Manganese Mines at Pani ...; the work of construction has been carried out by the Guzerat Railways Company who will undertake its working’ | |||
<ref>[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/18185/GIPE-015962.pdf?sequence=3&isAllowed=y "Railways in India – GOI Administrative Report 1916-17" page 13]; Retrieved 21 Feb 2016</ref>. | |||
The first section, 17 miles(27km), opened in 1911 from [[Champaner]] Road to [[Shivrapur]] with a 1.7 mile branch to Shivrapur Mines. The line was transferred to the Guzerat Railways Company from Apr 1915 and the line extended to [[Pani]] in 1916, a total of 31 miles(49km) <ref name=name/>. | |||
The railway was then owned and managed by the [[Guzerat Railway Company| Guzerat Railways Company]] and in 1922 the company was taken over by the [[Bombay, Baroda and Central India Railway]](BB&CIR). | |||
==Further Information== | |||
See '''[[Guzerat Railway Company| Guzerat Railways Company]]''' until 1922, then the '''[[Bombay, Baroda and Central India Railway]]''' | |||
== References == | == References == |
Revision as of 17:31, 21 February 2016
Champaner-Shivrajpur- Pani Light Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Champaner to Shivrapur | ||
Gauge / mileage | ||
2ft 6in NG | 31 miles (1916) | |
Timeline | ||
1911 | Champaner to Shivrapur section opened | |
1915-16 | Shivrapur to Pani opened in stages | |
1915 | Line transferred to the Guzerat Railways Company | |
1922 | Company taken over by the Bombay, Baroda and Central India Railway | |
Key locations | ||
Presidency | Bombay | |
Stations | Champaner, Shivrapur, Pani | |
System agency | ||
1911 | Worked by Guzerat Railways Company | |
1915 | Owned and worked byGuzerat Railways Company | |
1922 | Company taken over by BB&CIR | |
How to interpret this infobox |
The Champaner-Shivrajpur-Pani Light Railway was a 2ft 6in/762mm narrow gauge(NG) railway and was served from Halol. Constructed for the Shivrajpur Syndicate Ltd of Bombay [1] ‘to afford railway communication to the Manganese Mines at Pani ...; the work of construction has been carried out by the Guzerat Railways Company who will undertake its working’ [2].
The first section, 17 miles(27km), opened in 1911 from Champaner Road to Shivrapur with a 1.7 mile branch to Shivrapur Mines. The line was transferred to the Guzerat Railways Company from Apr 1915 and the line extended to Pani in 1916, a total of 31 miles(49km) [1].
The railway was then owned and managed by the Guzerat Railways Company and in 1922 the company was taken over by the Bombay, Baroda and Central India Railway(BB&CIR).
Further Information
See Guzerat Railways Company until 1922, then the Bombay, Baroda and Central India Railway