User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Work in progress draft
PEA-2292 (talk | contribs)
Blanked the page
Line 1: Line 1:
'''East Indian Railways - Locomotive Workshops'''


==Background==
"The [[East Indian Railway]](EIR) 'experimental line' from Howrah to Ranigani was authorised in 1849, and construction and started in 1851. The opening of the first section from [[Howrah]] to [[Hooghly]] in August 1854 was delayed due to unexpected impediments - one these was the locomotive shipped from England got misdirected to Australia, and could only be brought back ''(to Calcutta)'' in 1854 aboad 'Kedgeree'. Also 'HMS Goodwin' carrying the coaches ''(from Britain)'' sank at the Sandheads near Diamond Harbour ''(in the Hoogly River estuary near Calcutta)''. [[John Hodgson]], the Locomotive Engineer of EIR, got the carriages locally built with the help of two Calcutta coach building firms - Steward & Co and Seton & Co." <ref> “Symphony of Progress - The Saga of the Eastern Railway 1854-2003”; published by Eastern Railway, kolkata 2003; Extracted from pages 6 and 7</ref>.
==Locomotive Workshops - Howrah==
The first workshops to repair Locomotives and build Carriages and Wagons were established in [[Howrah]] and operational in the mid 1850’s.
*1852 Nov, [[John Hodgson]] was appointed EIR Superintendent of Locomotive Department based in Calcutta <ref name=grace>[http://www.gracesguide.co.uk/John_Hodgson_(1814-1857) Grace's Guide " John Hodgson"]; Retrieved 7 Jun 2016</ref>.
*1853, the Locomotive Workshop at this time was at [[Howrah]].
*1856, a Locomotive Workshop was also operational at [[Allahabad]] <ref name=grace/> under [[P D Nicholl]] Locomotive Superintendent, Upper Provinces,
*1857, [[Charles Lingard Stokes]] was appointed Locomotive Superintendent on the death of [[John Hodgson]] on breakout of the [[Indian Mutiny]] and when the [[Mutiny at Allahabad]] forced a state of siege to be declared
*By the late 1850's it was apparant that the 'head-quarters of the Locomotive Department were at Howrah, but ... was too confined to admit extensions... there was ... no room in Howrah for the workshops of the Locomotive Department, as well as for the Company's Carriage and Wagon Building works, and after long and mature consideration it was decided to remove the former to Jamalpur" <ref>[https://ia801404.us.archive.org/16/items/historyeastindi00huddgoog/historyeastindi00huddgoog.pdf Archive.org "History of the East Indian Railway ..." by George Huddlestone, page 241, pdf page 296]; Retrieved 10 Jun 2016</ref>.
*In 1862, the EIR Locomotive Workshops at [[Jamalpur]] were completed leaving the [[EIR Carriage and Wagon Workshop]] at [[Howrah]].
==Locomotive Workshops - Jamalpur==
Jamalpur was only an engine changing station and light repairs were carried out in the running shed there. It was on the original EIR mainline but with then opening of the [[ First Chord Line(EIR)|First Chord Line]](1871) and the [[Grand Chord Line(EIR)|Grand Chord Line]] (1906), it the became somewhat on the [[Sahibganj Loop(EIR)|Sahibganj Loop]].
*1860; Decision to construct the new locomotive workshops at Jamalpur. The various reasons for selecting Jamalpur as the location of the new locomotive workshops are well described in 'The History of the East Indian Railway' pages 240-251 <ref name=hudd>[https://ia801404.us.archive.org/16/items/historyeastindi00huddgoog/historyeastindi00huddgoog.pdf Archive.org "History of the East Indian Railway ..." by George Huddlestone, page 240-251, pdf page 295-306]; Retrieved 10 Jun 2016</ref>.
*1862; [[William St. John Galwey]], Resident Engineer in charge of the works of the EIR Jamalpur Locomotive works.
*1863, [[David Wilkinson Campbell]] became Locomotive Superintendent , Jamalpur following the retirement of [[Charles Lingard Stokes]].
*Huddlestone describes in full of the sections of the new workshops <ref name=hudd/> which comprised - Steel Foundry, Iron Foundry, Laboratory, Rolling Mill, Erecting & Fitting Shop, Point Crossing & Signal Interlocking Shop, Machine Shops, Other workshops: — Brass Foundry, Forge, Smithy, Pattern, Carpenter, Bolt and Nut, Brass Finishing, Tin and Coppersmiths', Cold Saw, Chain-testing, Wheel, Boiler, Millwright, Paint, and Tender Shop. In addition to which there was a large Detail Store.
*1887, [[John Strachan]] became Locomotive Superintendent on promotion of
[[David Wilkinson Campbell]] to EIR Agent
*1890, [[Alan Wood Rendell]] became Locomotive Superintendent when [[John Strachan]] retired
*1901, [[Tomyns Reginald Browne]] became Locomotive Superintendent, he had previously been Carriage and Wagon Superintendent at [[Howrah]] then [[Lillooah]]
*On 15 January 1935, the Jamalpur Locomotive Workshops, along with the entire railway colony, were destroyed by an earthquake. It took 3 years to rebuild the facility.
== References ==
<references />
[[Category:Railways]]
[[Category:Railway Locomotive Manufacturers and Repairers‎]]

Revision as of 12:48, 11 June 2016