User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Work in progress draft
PEA-2292 (talk | contribs)
Blanked the page
Line 1: Line 1:
==Madras Railway Lines==
The Madras Railway (MR) constructed and worked an extensive network of broad gauge([[Rail_gauge#Broad_Gauge|BG]]) lines.


In addition in 1901 the southern part of [[East Coast State Railway]](ECSR), renamed [[Madras (North-East) Railway]] was transferred to MR and became part of the MR network.
The MR contract expired on 31 Dec 1907, at this point the BG route mileage was 1449 miles(2331km)
*From 1 Jan 1908 the [[Jalarpet-Mangalore Mainline]] section, being 417 miles(671km), was transferred from MR to the [[South Indian Railway]](SIR).
*The remaining BG lines, 1032 miles(1660km) were taken over by the [[Madras and Southern Mahratta Railway]](M&SMR)
The MR also worked several lines on behalf of other parties. The working arrangements for thse were transferred to SIR and M&SMR
See '''[[Madras Railway – Lines owned and worked]]''' for details and information:-
*BG Lines - owned and worked by Madras Railway (MR)
*BG Railways worked by Madras Railway
*NG Railways worked by Madras Railway

Revision as of 09:24, 30 November 2016