East Indian Railway: Difference between revisions
HughWilding (talk | contribs) m Disambiguation of what is held at IOR. |
HughWilding (talk | contribs) mNo edit summary |
||
Line 22: | Line 22: | ||
== External Links == | == External Links == | ||
[http://irfca.org/gallery/Heritage/zonal_logos/DSCN5174.jpg.html East | [http://irfca.org/gallery/Heritage/zonal_logos/DSCN5174.jpg.html East Indian Railway logo] | ||
[http://www.scienceandsociety.co.uk/results.asp?txtkeys1=East+India+Railway Science & Society Picture Library] | [http://www.scienceandsociety.co.uk/results.asp?txtkeys1=East+India+Railway Science & Society Picture Library] |
Revision as of 07:57, 18 November 2008
Formed in 1845, the East Indian Railway (EIR) was not contracted by the East India Company to begin raliway construction until 1849, and it was not until 1855 that the EIR opened its first section from Howrah to Hooghly. By 1864, the EIR had arrived in Delhi although it was not until 1871 that the Bombay-Calcutta route was completed when the Great India Peninsula Railway (GIPR) reached Allahabad.
Built on the same terms and conditions as the GIPR, the EIR was a British company, registered in London, privately owned and financed, operating under license and guarantee from the (British) Board of Control in India.
Records
The following are held in the India Office Records at the British Library.
- L/AG/46/11/133-137 : Contracts of appointment, c1858-1925 (possibly not all included)
The above is indexed in
- Z/L/AG/46 : Index to UK Appointments to Indian Railways (1849-1925)
The following is not included in the index Z/L/AG/46.
- L/AG/46/11/138-141 : Half-yearly staff lists, 1861-1890 & 1911-1922 (giving ages from 1886)