Calcutta Chord Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Records section source link to IOR and text changes; References added
PEA-2292 (talk | contribs)
m Line length and stations added
 
Line 3: Line 3:
<ref>[http://www.gracesguide.co.uk/Willingdon_Bridge Graces Guide "Willingdon_Bridge"];  Retrieved 3 Apr 2016</ref>
<ref>[http://www.gracesguide.co.uk/Willingdon_Bridge Graces Guide "Willingdon_Bridge"];  Retrieved 3 Apr 2016</ref>


The line opened in 1931-32
The 5 mile(8Km) line opened in 1931-32 with stations at Dum Dum, Noapora, Baranagar Road, Dakshineswar, Bally.
 
The


==Records==
==Records==

Latest revision as of 17:20, 14 January 2019

The Calcutta Chord Railway was constructed by the East Indian Railway(EIR) as a link from Dum Dum, crossing the River Hooghly at Bally via the Willindon Bridge to Dankuni. [1] [2]

The 5 mile(8Km) line opened in 1931-32 with stations at Dum Dum, Noapora, Baranagar Road, Dakshineswar, Bally.

The

Records

An on-line search of the India Office Records (IOR) records held at the British Library relating to this railway [3] gives the following entry: -

  • L/F/7/909; "Collection 108/6: East India Railway: Calcutta Chord Railway, construction and estimates."; 1925-1932

Further Information

See East Indian Railway

References

  1. “Symphony of Progress - The Saga of the Eastern Railway 1854-2003”; published by Eastern Railway, 2003; page 31
  2. Graces Guide "Willingdon_Bridge"; Retrieved 3 Apr 2016
  3. “British Library Archives and Manuscripts Catalogue” - Search; Retrieved 3 Apr 2016