Assam-Bengal Railway: Difference between revisions
Jump to navigation
Jump to search
HughWilding (talk | contribs) Infoboxes & content added |
HughWilding (talk | contribs) More content added |
||
| Line 2: | Line 2: | ||
|image= | |image= | ||
|caption= | |caption= | ||
|route= | |route= [[Chittagong]] to [[Tinsukia]]<br>[[Lumding]] to [[Gauhati]]<br>[[Lakshar]] to [[Chandpur]] (branch)<br>[[Badarpur]] to [[Silchar]] (branch) | ||
|gauge1= Metre gauge | |gauge1= Metre gauge | ||
|gauge1details= 740 miles (1905) | |gauge1details= 740 miles (1905) | ||
| Line 11: | Line 11: | ||
|gauge4= | |gauge4= | ||
|gauge4details= | |gauge4details= | ||
|timeline1date= | |timeline1date= 1891 | ||
|timeline1details= | |timeline1details= Construction started | ||
|timeline2date= | |timeline2date= 1898 | ||
|timeline2details= | |timeline2details= First section opened to traffic | ||
|timeline3date= | |timeline3date= 1904 | ||
|timeline3details= | |timeline3details= Traffic running throughout the length of the srailway | ||
|timeline4date= | |timeline4date= | ||
|timeline4details= | |timeline4details= | ||
Revision as of 20:09, 30 December 2008
| Assam-Bengal Railway | ||
|---|---|---|
| [[Image:|150px| ]] | ||
| Line of route | ||
| Chittagong to Tinsukia Lumding to Gauhati Lakshar to Chandpur (branch) Badarpur to Silchar (branch) | ||
| Gauge / mileage | ||
| Metre gauge | 740 miles (1905) | |
| Timeline | ||
| 1891 | Construction started | |
| 1898 | First section opened to traffic | |
| 1904 | Traffic running throughout the length of the srailway | |
| Key locations | ||
| Presidency | Bengal | |
| Stations | ||
| System agency | ||
| 1892 | Assam-Bengal Railway | |
| 1942 | Bengal and Assam Railway | |
| How to interpret this infobox | ||
| Assam-Bengal Railway | ||
|---|---|---|
Assam-Bengal Railway device | ||
| System timeline | ||
| 1892 | Company formed to manage state line | |
| Constituent companies / lines | ||
| 1892 | Assam-Bengal Railway | |
| Noakhali (Bengal) Railway | ||
| Key locations | ||
| Headquarters | Chittagong | |
| Workshops | ||
| Major Stations | ||
| Successor system / organisation | ||
| 1942 | Bengal and Assam Railway | |
| System mileage | ||
| Metre gauge | 775 miles (1905) | |
| Associated auxiliary force | ||
| Assam Bengal Railway Battalion | ||
| How to interpret this infobox | ||
The Assam-Bengal Railway (ABR) was a metre gauge railway built to connect the highlands of Assam with the port of Chittagong.