Assam-Bengal Railway: Difference between revisions
Jump to navigation
Jump to search
HughWilding (talk | contribs) More content added |
HughWilding (talk | contribs) m Typo |
||
Line 16: | Line 16: | ||
|timeline2details= First section opened to traffic | |timeline2details= First section opened to traffic | ||
|timeline3date= 1904 | |timeline3date= 1904 | ||
|timeline3details= Traffic running throughout the length of the | |timeline3details= Traffic running throughout the length of the railway | ||
|timeline4date= | |timeline4date= | ||
|timeline4details= | |timeline4details= |
Revision as of 10:42, 11 January 2009
Assam-Bengal Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Chittagong to Tinsukia Lumding to Gauhati Lakshar to Chandpur (branch) Badarpur to Silchar (branch) | ||
Gauge / mileage | ||
Metre gauge | 740 miles (1905) | |
Timeline | ||
1891 | Construction started | |
1898 | First section opened to traffic | |
1904 | Traffic running throughout the length of the railway | |
Key locations | ||
Presidency | Bengal | |
Stations | ||
System agency | ||
1892 | Assam-Bengal Railway | |
1942 | Bengal and Assam Railway | |
How to interpret this infobox |
Assam-Bengal Railway | ||
---|---|---|
Assam-Bengal Railway device | ||
System timeline | ||
1892 | Company formed to manage state line | |
Constituent companies / lines | ||
1892 | Assam-Bengal Railway | |
Noakhali (Bengal) Railway | ||
Key locations | ||
Headquarters | Chittagong | |
Workshops | ||
Major Stations | ||
Successor system / organisation | ||
1942 | Bengal and Assam Railway | |
System mileage | ||
Metre gauge | 775 miles (1905) | |
Associated auxiliary force | ||
Assam Bengal Railway Battalion | ||
How to interpret this infobox |
The Assam-Bengal Railway (ABR) was a metre gauge railway built to connect the highlands of Assam with the port of Chittagong.