How to interpret this infobox

From FIBIwiki
Revision as of 01:11, 15 May 2009 by HughWilding (talk | contribs) (At last!)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
How to interpret this infobox

Agra rail connections, 1938
Line of route
Agra East Bank to Belanganj
Drummond Road to Alumganj
Gauge / mileage
MG 12 miles (1938)
Timeline
1890 Line opened to traffic
Key locations
Presidency Bengal
Stations Agra East Bank, Agra Fort, Idgrah
System agency
1900 worked by BB&CIR
How to interpret this infobox

A Line infobox is used to summarize information about a particular railway. A Line infobox is always framed in grey and the railway's name will usually appear on the title bar along the top of the gray

A word or phrase of the data highlighted in blue indicates an internal link to another article which will provide further information. Use your browser's back button to return to this explanation. A word or phrase in red will indicate that although the link has been established, there is as yet no content to go to.

Space is provided for an appropriate image or route diagram, together with caption. Click on the image to make it appear larger.



Line of route
The principal route of the railway will be given plus any branchlines.


Gauge/mileage
The gauge(s) in use will be identified (abbrevations used will be BG = broad gauge, MG = metre gauge, 2'6" NG = 2'6" narrow gauge, 2'0" NG = 2'0" narrow gauge) together with the mileage open to traffic at given dates.
Timeline
This will identify key dates in the development of the railway e.g. opening, nationalisation, closure.
Key locations
The Presidency (Bengal, Bombay or Madras) that the line operates in will be identified as will be the main stations. Where possible, the names used will be the standard IRCA version, and will link through to information about the location.
System agency
Many lines were worked by a larger railway company as part of the latter's system, or even by the GOI as a nationalised undertaking.




How to interpret this infobox

Mumbai local trains
System timeline
1908 Company re-formed
1925 Nationalised by GOI
1950 Merged to form new IR Zone
Constituent companies / lines
1908 Great Gondor Railway
1908 Cirith Ungol Light Railway
1910 Mount Doom Rack Railway
Key locations
Headquarters Minas Tirith
Workshops Mines of Moria
Major Stations Bywater, Edoras, Helm's Deep, Isengard, Mordor, Rivendell
Successor system / organisation
1950 Middle-earth Railway (IR Zone)
System mileage
BG 1200 miles (1944)
MG 450 miles (1944)
Associated auxiliary force
Rohan Railway Rifles
How to interpret this infobox

A System infobox is framed in yellow and is used to provide information about the large groupings that developed over time. Sometimes,as with the East Indian Railway, both types of infobox are used. The name of the system will appear on the top title bar of the System infobox.

Space is provided for an appropriate image or route diagram, together with caption. Click on the image to make it appear larger and use the back button of your browser to return to the page you were viewing.



System timeline
Key dates in the history of the System - formation, takeover or merger of other lines, nationialisation. Effectively, railwaymen became civil servants when their line was nationalised. Knowing when this happened makes checking publications like the India List more straightforward.


Constituent companies / lines
Names of constituent undertakings with dates of merger or takeover




Key locations
Location of System Hedquarters, workshops, principal stations.




Successor system / organisation
Ultimately the zone of Indian Railways that the system became part of.
System mileage
Total mileage at date given for gauge stated.



Associated auxiliary force
Volunteer forces were part-time units which recruited from railway personnel. The major systems had their own battalions and regiments, and these have been identified among the Auxiliary Regiments.