Mayavaram Mutupet Railway
The Mayavaram Mutupet Railway opened with a section of 31 miles (50km) in 1890 and completed in 1894.
The line was owned by Tanjore District Board and worked by the South Indian Railway(SIR) [1] [2]
The Mayavaram Mutupet Railway opened with a section of 31 miles (50km) in 1890 and completed in 1894.
The line was owned by Tanjore District Board and worked by the South Indian Railway(SIR) [1] [2]