Ranagat-Bangaon Railway

From FIBIwiki
Revision as of 11:42, 2 December 2015 by PEA-2292 (talk | contribs) (Data added, links checked, Work-in-progress removed, References added)
Jump to navigation Jump to search

The Ranaghat-Bhagwangola Railway opened in 1905 as a branch of the East Bengal Railway(EBR). The name of the branch changed as the line progressed

  • Ranaghat-Bhagwangola Railway in 1884. [1]
  • Ranaghat- Murshidabad Branch before 1905
  • Lagola Branch in 1905. [2]

The branch ran from the EBR mainline at Ranaghat, via Bhagwangola and Murshidabad, to the terminus at Lalgola Ghat on the River Ganges. [3]

References

  1. No 68 Capital Railway Expenditure in India on Railways 1882-8. See dsal.uchicago.edu/statistics/1876.../1876.068.XLS
  2. [1] Wikipedia - Laloga Branch
  3. [2] Bengal District Gazetteer ; Mukshidabad by L S S O’Malley, Indian Civil Service, Calcutta . Pages 150-151