First Chord EIR Line

From FIBIwiki
Revision as of 16:12, 10 November 2016 by PEA-2292 (talk | contribs) (New page all checked)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

First Chord EIR Line

The EIR section from Khana Junction to Sitarampur, opened in stages from 1855-63; reaching Luckeeserai 1871. 183 miles(294km) [1] . .

Initially called the Chord Line, but as traffic increased then it was re-designated as part the Howrah-Delhi EIR Main Line with the Khana Junction-Bhagalpur-Jamalpur-Luckeeserai section became secondary and became designated as the Sahibganj Loop EIR Line [2].

Further Information

See East Indian Railway page

and East Indian Railway – Lines owned and worked page, which includes details of the branches and extensions to this Main Line.

References

  1. “Administration Report on Railways 1918” page 53 (pdf62); Retrieved 9 Nov 2016
  2. “Symphony of Progress - The Saga of the Eastern Railway 1854-2003”; published by Eastern Railway, 2003; page 15