Sutlej River Training Works Railway, 1915-16
Sutlej River Training Works Railway
The Nalagarh Quarry was used again to provide materials to the ‘Sutlej River Training Works’ at Ropar from Dec 1915 to May 1916. A 2ft/610mm narrow gauge(NG) was laid from the headworks, along the riverbank 14 miles(22km) to the Nalagarh Quarries. The record shows that 30hp locomotives with trucks were used [1].
References
- ↑ “Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at http://irsshop.co.uk/India. Reference: Entry PB13 page ....