Changes

Jump to navigation Jump to search

Agra-Gwalior Railway

1,674 bytes added, 08:37, 12 April 2020
Further Information: link added
The '''Agra-Gwalior Railway''' was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line from [[Gwalior]] to [[Agra]] and completed in 1881. The [[Agra]] Cantonment to [[Dholpur]] section was opened in 1878; the [[Gwalior]] to Hetampur section, 1879; the final section [[Dholpur]] to Hetampur, 1881.Total line length 76 miles(122km) <ref name =AdminGIPR>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#REDIRECT page/n73/mode/1up “Administration Report on Railways 1918” page 65 (pdf73)]; Retrieved 15 Dec 2016</ref>.  The railway, owned by [[Princely states|Princely ]][[Gwalior State ]] Durbar, appears to have been worked independently until 1885 when the [[Indian Midland Railway]] (IMR), a state agency, was formed to undertake the working of several existing broad gauge([[Rail_gauge#Broad_Gauge|BG]]) branch lines. The IMR worked this line for a short time until amalgamated into the [[Great Indian Peninsula Railway]](GIPR) broad gauge([[Rail_gauge#Broad_Gauge|BG]]) becoming part of the ‘Midland Section GIPR Mainline’<ref name =AdminGIPR/>  The 1918 Administation Report <ref name =AdminGIPR/> describes this section of the GIPR being owned by '''[[Scindia State Railway]]'''  ==Further Information==From 1885 to 1900 see '''[[Indian Midland Railway]]''' From 1900 onwards see ''' [[Great Indian Peninsula Railway]]''' ''See also'' [[Great_Indian_Peninsula_Railway_-_Lines_owned_and_worked#Former_IMR_Lines_transferred_to_GIPR|''' IMR Lines transferred to GIPR ''']] ''See also'' '''[[Scindia State Railway]]''' for further clarification == References ==<references /> [[Category:Railways]][[Category:State Railways]]
9,628
edits

Navigation menu