Changes

Jump to navigation Jump to search

Cawnpore-Banda Railway

1,134 bytes added, 10:14, 5 April 2021
'Stations' and internal link added
The '''Cawnpore-Banda Railway''' was a broad gauge({{Line Railways Infobox|image= |caption= |route= [[Rail_gauge#Broad_GaugeCawnpore|BG]]) line, opened 1913-14 and worked by [[Great Indian Peninsula Railway]]Cawnpore (GIPRJuhi/Govindpur Junction). The line from [[Juhi]] opened in 1913 and reached [[Khirada]] in 1914, a distance of 73 miles(116km)
The to Khairar Junction (Khirada)|gauge1= Broad gauge|gauge1details= 73 miles (1914)|gauge2= |gauge2details= |gauge3= |gauge3details= |gauge4= |gauge4details=|timeline1date= 1913 Apr|timeline1details= Juhi to Hamirpur Road section opened|timeline2date= 1914 Jul|timeline2details= Hamirpur Road to Khirada opened|timeline3date= |timeline3details= |timeline4date= |timeline4details= |timeline5date= |timeline5details= |presidency= [[Bombay (Presidency)|Bombay]]|stations= '''[[Cawnpore]] '''''See also separate page'' [[Cawnpore-Banda Railway was constructed Railways and worked as a State line Stations| ''' Cawnpore Stations''']] ''for details''|system1date= 1913|system1details= Worked by the [[Oudh and Rohilkhand Railway]](O&RR) up to the 31 March |system2date= 1915; thereafter the maintenance, management and working of the line was taken over Apr|system2details= Worked by GIPR.[[Great Indian Peninsula Railway]] <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n84/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government |system3date=|system3details= Printing, Calcutta; page 76]; Retrieved 31 Jan 1916</ref>}}
[[File: Cawnpore-Banda Railway.png|thumb| Cawnpore-Banda Railway]] The 'Classified list of gazetted establishment ''Cawnpore-Banda Railway''' was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line. The line from [[Cawnpore|Cawnpore (Juhi / Govindpur Junction)]] opened in 1913 and reached Khairar Junction (Khirada) in 1914, a distance of 73 miles(116km). Khairir Junction is where the line joined the [[Great Indian railways' records the Peninsula Railway]](GIPR) 5 miles(8km) from [[Banda]].  The Cawnpore-Banda Railway in was constructed and worked as a State line by the [[Oudh and Rohilkhand Railway]](O&RR) up to the 31 March 1915. Thereafter the years 1914 maintenance, management and 1919working of the line was taken over by [[Great Indian Peninsula Railway]](GIPR)<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n85/mode/1up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 76]; Retrieved 10 Nov 2018</ref>.
==Records==
*'''L/F/8/1-20''' "Appointments to State Railways made in the UK; 1855-1946"
*'''Z/L/F/8/1-2''' "Index to Appointments to State Railways made in the UK; 1855-1946"
 
==Further Information==
See '''[[Oudh and Rohilkhand Railway]]''' up to 1915, then '''[[Great Indian Peninsula Railway]]'''
== References ==
9,628
edits

Navigation menu