Difference between revisions of "Central Indian Coalfields Railway"

From FIBIwiki
Jump to navigation Jump to search
(Revised with new info and references)
(Full revision)
Line 1: Line 1:
The '''Central Indian Coalfields Railway''' was owned by the Government of India.  
+
The '''Central Indian Coalfields Railway ''' was owned by the Government of India.  
  
With the development of ‘[[South Karanpura Coalfield]]’, the broad gauge([[Rail_gauge#Broad_Gauge|BG]]) ‘Central India Coalfields Railway’  was created , constructed by the ‘[[Bengal-Nagpur Railway]]’(BNR),.
+
With the development of ‘[[South Karanpura Coalfield]]’, the broad gauge([[Rail_gauge#Broad_Gauge|BG]]) ‘Central India Coalfields Railway’  was created , constructed by the ‘[[Bengal-Nagpur Railway]]’(BNR),.
  
The section from [[Chandrapura]] to [[Bermo]], 11½ miles(19km)  had opened in 1915, ''presumably as part of the BNR  system''.
+
The section from [[Chandrapura]] to [[Bermo]], 11½ miles(19km)  had opened in 1915<ref name=Hist1937>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page 84 pdf113 ]; Retrieved 24 Jul 2020</ref>, ''presumably as part of the BNR  system''.
  
The extension from [[Bermo]] via Danca to [[Barkakana]], 43 miles(71km) opened in 1926-2.  This line was transferred to the EIR in Apr 1928 <ref name=Hist>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page 84 pdf113 ]; Retrieved 24 Jul 2020</ref>.
+
The extension from [[Bermo]] via Danca to [[Barkakana]], 43 miles(71km) opened in 1926-2.  This line was transferred to the EIR in Apr 1928 <ref name=Hist1937/>.
  
 
A further extension by the EIR from [[Barkakana]] to [[Daltonganj]], 113 miles(182km) opened  in 1929 <ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/south-eastern-railway.pdf Indian Railway Line History by Keith Scholey]; Retrieved 10 Dec 2015</ref>
 
A further extension by the EIR from [[Barkakana]] to [[Daltonganj]], 113 miles(182km) opened  in 1929 <ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/south-eastern-railway.pdf Indian Railway Line History by Keith Scholey]; Retrieved 10 Dec 2015</ref>
Line 13: Line 13:
  
 
==Coalfields and Collieries Served ==
 
==Coalfields and Collieries Served ==
The railway provided communication to the following:-
+
The railway provided communication to the following ''see separate pages '':-
 
* ‘[[South Karanpura Coalfield]]’
 
* ‘[[South Karanpura Coalfield]]’
 
* ‘[[North Karanpura Coalfield]]’
 
* ‘[[North Karanpura Coalfield]]’
 +
* ‘[[Kurhurbaree Colliery]]’
 +
* ‘[[Seramphore Colliery]]’
 
* ‘[[Bhurkunda Colliery]]’
 
* ‘[[Bhurkunda Colliery]]’
 
* ‘[[Bokaro_Ramgarh_Coalfields_Railways#The_Coalfields|Bokaro Coalfield]]’
 
* ‘[[Bokaro_Ramgarh_Coalfields_Railways#The_Coalfields|Bokaro Coalfield]]’
Line 22: Line 24:
 
==External Links==
 
==External Links==
 
*[https://en.wikipedia.org/wiki/South_Karanpura_Coalfield "South Karanpura Coalfield"] Wikipedia  
 
*[https://en.wikipedia.org/wiki/South_Karanpura_Coalfield "South Karanpura Coalfield"] Wikipedia  
*[https://en.wikipedia.org/wiki/North_Karanpura_Coalfield "Nouth Karanpura Coalfield"] Wikipedia
+
*[https://en.wikipedia.org/wiki/North_Karanpura_Coalfield "North Karanpura Coalfield"] Wikipedia
 
*[https://en.wikipedia.org/wiki/Barkakana_railway_station "Barkakana Railway Station "] Wikipedia  
 
*[https://en.wikipedia.org/wiki/Barkakana_railway_station "Barkakana Railway Station "] Wikipedia  
  

Revision as of 09:33, 24 July 2020

The Central Indian Coalfields Railway was owned by the Government of India.

With the development of ‘South Karanpura Coalfield’, the broad gauge(BG) ‘Central India Coalfields Railway’ was created , constructed by the ‘Bengal-Nagpur Railway’(BNR),.

The section from Chandrapura to Bermo, 11½ miles(19km) had opened in 1915[1], presumably as part of the BNR system.

The extension from Bermo via Danca to Barkakana, 43 miles(71km) opened in 1926-2. This line was transferred to the EIR in Apr 1928 [1].

A further extension by the EIR from Barkakana to Daltonganj, 113 miles(182km) opened in 1929 [2] [3].

The section from Anuppur to Chirimiri was worked by the Bengal Nagpur Railway(BNR) and was absorbed by that railway on 1st October 1944.

Coalfields and Collieries Served

The railway provided communication to the following see separate pages :-

External Links

References

  1. 1.0 1.1 US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page 84 pdf113 ; Retrieved 24 Jul 2020
  2. Indian Railway Line History by Keith Scholey; Retrieved 10 Dec 2015
  3. ‘Symphony of Progress – The History of Eastern Railways’ by Pradeep Kumar and Soumitra Majumdar, page 23