Changes

Jump to navigation Jump to search

Eastern Bengal Railway

483 bytes added, 14:33, 2 January 2016
Gov. Repeal Bill info added with references and text reaarranged
}}
The '''Eastern Bengal Railway''' (EBR) was formed in 1857 for "the construction and working of a line from [[Calcutta]] to [[Dacca]], with a branch to [[Jessore]]. Capital 1,000,000''l''. This amount has been sanctioned for the line from Calcutta to the Ganges at Kooshtee([[Kushtia]]), near Pubnah, about 80 miles, all that is authorised to be proceeded with at present. Rate of Interest Guaranteed - 5 per cent on 1,000,000''l''." <sup>1</sup>
== History ==The first construction started in October 1859 and the first train ran between [[Sealdah]] and [[Ranaghat]] in September 1862. Thereafter further phases considerably extended the reach of the line and, by 1866, it linked [[Calcutta]] to [[Kushtia]]. The company had also acquired a steam vessel service operating between [[Kushtia]] and [[Dacca]].<ref>[https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/228649/8330.pdf H.M. Government “Statute Law Repeals: Nineteenth Report : Draft Statute Law (Repeals) Bill; April 2012"; pages 127-8, paragraphs 3.51 - 3.55] Retrieved on 2 January 2016</ref> The EBR became the '''Eastern Bengal State Railway''' (EBREBSR) was formed in 1857 for ", owned and managed by the construction and working Government of India([[Government of a line from Calcutta to DaccaIndia |GoI]]), with a branch to Jessoreon 30 June 1884. Capital 1,000,000''l''. This amount has been sanctioned for  The GoI merged the line from [[Calcutta to and South Eastern Railway]] into the Ganges at KooshteeEBSR, near Pubnahand several others in 1887. In 1904, about 80 milesthe EBSR took over the [[Bengal Central Railway]] which it had previously been working, all that is authorised to be proceeded with at presentand the [[Brahmaputra-Sultanpur Railway]]. Rate of Interest Guaranteed - 5 per cent on 1In 1915,000the system reverted to the style,000''l'Eastern Bengal Railway'''.<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; pages 42(BG); 47(MG); 52(NG)]; Retrieved 17 Dec 2015</ref><ref>[http://en.banglapedia.org/index.php?title=Railway Banglapedia " National Encyclopaedia of Bangladesh" Railway]; Retrieved 17 Dec 2015</ref><supref>1[http://inforail.blogspot.com/2012/10/brief-history-of-bangladesh-railway.html "Brief History of Bangladesh Railway" Bangladesh Railway Information]; Retrieved 17 Dec 2015</suprefDuring the 1920s, the EBR continued to grow by merger and amalgamation, and also began to convert sections of metre and narrow gauge to eliminate rail bottlenecks. On 1 January 1941, the GoI acquired the [[Bengal Dooars Railway]] and merged it into the EBR. In 1942, the GoI merged the EBR with the [[Assam Bengal Railway]] to create the [[Bengal and Assam Railway]].
==Branch Lines and extensions==
==Lines worked by EBR at some time==
*[[Khulna-Bagerhat Railway]] opened 1918-19. Narrow gauge(NG) railway; constructed in 1918. Worked by EBR
*[[Lalmonirhat-GitalahaGitaldaha(Geetaldaha) Railway]] opened c.1900. Link between [[Bengal Dooars Railway]] and [[Cooch Behar State Railway]], jointly worked.
*[[Teesta-Kurigram Railway]] opened c.1885. Section of [[Kaunia-Kurigram Railway]] , worked by EBR
*[[Netrakona-Mohanganj Railway]] was constructed between 1912 and 1918 by the Mymensingh–Bhairab Bazar Railway Company, worked by EBR
*[[Pandu Ghat-Gauhati Railway]] opened c.1908 Link constructed by EBR to link the [[Amingaon-Pandu Train Ferry]]. Rail transhipment by ferry crossing the Brahmaputra River linking EBR system to [[Assam Bengal Railway]](ABR)'s network. Worked by ABR; transferred to ABR, 1922
*[[Sara Train Ferry]] opened c.1899. Ferry link from EBR main line across Ganges to Sara taking Goods wagons. Operated until 1915 on opening of Hardinge Bridge
 
== History ==
 
The first track was laid along the east bank of the Ganga to [[Kushthia]] and then across the river to [[Dacca]]. The line to Kushthia was opened in 1862, ending in [[Calcutta]] at [[Sealdah]]. The EBR became the '''Eastern Bengal State Railway''', owned and managed by the Government of India (GoI), on 30 June 1884.
 
The GoI merged the [[Calcutta and South Eastern Railway]] into the EBSR, and several others in 1887. In 1904, the EBSR took over the [[Bengal Central Railway]] which it had previously been working, and the [[Brahmaputra-Sultanpur Railway]]. In 1915, the system reverted to the style, '''Eastern Bengal Railway'''.
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; pages 42(BG); 47(MG); 52(NG)]; Retrieved 17 Dec 2015</ref>
<ref>[http://en.banglapedia.org/index.php?title=Railway Banglapedia "National Encyclopaedia of Bangladesh" Railway]; Retrieved 17 Dec 2015</ref>
<ref>[http://inforail.blogspot.com/2012/10/brief-history-of-bangladesh-railway.html "Brief History of Bangladesh Railway" Bangladesh Railway Information]; Retrieved 17 Dec 2015</ref>
 
During the 1920s, the EBR continued to grow by merger and amalgamation, and also began to convert sections of metre and narrow gauge to eliminate rail bottlenecks. On 1 January 1941, the GoI acquired the [[Bengal Dooars Railway]] and merged it into the EBR.
 
In 1942, the GoI merged the EBR with the [[Assam Bengal Railway]] to create the [[Bengal and Assam Railway]].
 
== Records ==
9,628
edits

Navigation menu