9,628
edits
Changes
Jump to navigation
Jump to search
'Kaisar-i-Hind Bridge' link spelling corrected
The IVSR, which included the ‘Empress Bridge’, was merged with other railways in January 1886 to form the [[North Western Railway]](NWR).
The ‘Empress Bridge’ was the first rail bridge to span the Sutlej River ''(Until the opening of the [[KaisirKaisar-i-Hind Bridge]] some 110 miles upstream which was opened by the [[North Western Railway]](NWR) in 1887)''
==Design Specification==