Changes

Jump to navigation Jump to search

Goalundo-Narayanganj Extension Railway Survey

395 bytes added, 10:33, 1 April 2019
References added and text changes
[[File: Goalundo-Narayanganj Extension Railway Survey.png|thumb| Goalundo-Narayanganj Extension Railway Survey]]
The '''Goalundo-Narayanganj Extension''' was surveyed by the [[Eastern Bengal Railway]](EBR) during the period 1894-98. The record states “the object of connecting Calcutta with the Assam-Bengal Railway” <ref<>[https://archive.org/details/in.ernet.dli.2015.208633/page/n7 “Summary of the principal measures of the viceroyalty of the Earl of Elgin in the Public Works Department Jan 1894 to Dec 1898” page 21, para 77, pdf 34]; Retrieved 25 Jan 2019</ref>.
This line was not constructed, ; it involved crossing the River Ganges.  A further survey was undertaken in 1906 to connect this proposed line to the [[Hajiganj-Shatnal Railway Survey|proposed '''Hajiganj-Shatnal Railway''' -'' see separate page'']] <ref>[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n0/mode/1up "Histories of (Indian)Railway P rojects ...up to June 1906"]; Retrieved 1 Apr 2019</ref>.<br>This line also was not constructed.
Even today the railway stops at Goalundo Ghat Station, a short distance from the ferry terminal at Daulatdia crossing to Paturia on the opposite bank of the Ganges.
9,628
edits

Navigation menu