Changes

Jump to navigation Jump to search

Indian Midland Railway

3 bytes removed, 11:15, 4 July 2020
m
no edit summary
*1886, the initial section of IMR, from [[Bhopal]] to [[Agra|Agra Cantonment]] was completed by May 1881. The railway connected to the ‘[[Rajputana-Malwa State Railway]]’(RMSR) near the Cantonment Station at Agra (The RMSR only existed until 1885 when it became part of the ‘[[Bombay, Baroda and Central India Railway]]’(BB&CIR)) . The entire line was amalgamated into GIPR, 1900 becoming the [[Great_Indian_Peninsula_Railway_-_Lines_owned_and_worked#GIPR_Midland_Mainline |‘GIPR Midland Mainline’ ]]
** ‘Bhopal-Jhansi Section’ via Bina; 1880, 180 miles(290km)
** ‘Jhansi-Gwallior Gwalior Section’; 1880, 60 miles(97km)** ‘Gwallior‘Gwalior-Dholpur Section’; 1879-80-81, 40 miles(64km) - originally ‘[[Scindia State Railway]]’ - ''see Note A''
** ‘Dholpur-Agra Cantonment Section’; 1878, 36 miles(58km) - originally ‘[[Scindia State Railway]]’ - ''see Note A''
<blockquote>''Note A:-'' These two sections, described in some documents as the ‘[[Agra-Gwalior Railway]]’, completed 1881; Indian State line, owned by Gwallior Gwalior Durbar. This railway was known as ‘[[Scindia State Railway]]’ and was handed over to the IMR under a Contract dated March 1890. <ref> British Library IOR/L/F/8/13 (953) ‘Contract with the Indian Midland Railway Company Limited as to the handing over of the Sindia State Railway’, 18 March 1890</ref></blockquote>
* 1886-88 ‘Jhansi- Cawnpore Section’ , was under construction when the IMR was formed. ; from [[Jhansi ]] to [[Cawnpore]], 1886-88, 136 miles(219km); later known as the ‘Cawnpore Branch’- ''see Note B''
<blockquote>''Note B:-'' Early records describe part of this as the ‘[[Jhansi-Konch-Kalpi Railway]]’. In fact the line, when constructed, ran from [[Jhansi]] to [[Kalpi]] on onward to [[Cawnpore]]. Konch was only connected in 1903 by the GIPR ‘[[Ait-Kunch Branch Railway]]’. </blockquote>
9,628
edits

Navigation menu