Changes

Jump to navigation Jump to search

Satpura Railway

7 bytes added, 06:26, 13 December 2016
m
Internal Link added
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n15/mode/1up “Administration Report on Railways 1918” page 6 (pdf15)]; Retrieved 11 Dec 2016</ref>
* ‘Gondia-Chanda Mainline’, opened from [[Gondia]] to [[Nagbhir]], 1908; to Rajoli, 1910; to Babupeth, 1913; reaching [[Chanda]] Fort in 1916. The Nagbhir-Chanda work was started in 1906 but due to the shortage of funds was not completed until 1st April 1913 .<ref>[http://www.secr.indianrailways.gov.in/uploads/files/1312278598168-Tourist%20Places.pdf Indian Railways “History of Nagpur Division” ]; Retrieved 11 Dec 2016</ref> as far as Babupeth with the last 2 miles to [[Chandra]] Fort opening in 1916. Length 149 miles(239 km)
**’Nagbhir'[[Nagbhir-Nagpur Extension’Branch Railway]]’, opened from [[Nagbhir]] to Itwari , in suburbs of [[Nagpur]], 1908 with later rearrangements at Itwari. Length 68 miles ( 109km)
== Worked by BNR's Satpura Railway==
9,628
edits

Navigation menu