Changes

Jump to navigation Jump to search

Southern Mahratta Railway

133 bytes added, 15:32, 17 December 2016
'Birur-Shimoga Railway' text changes and other minor text corrections
==Railways absorbed into/worked by SMR==
*[[ Birur-Shimoga Railway]]a metre gauge([[Rail_gauge_#Metre_Gauge|MG) ]] branch line in the Indian State of Mysore, it was worked opened in 1899, 38 miles(61km). Worked by SMR and from 1908 by M&SMRuntil 1919. See [[Birur-Shimoga Railway]].*[[Bellary-Kistna State Railway]] constructed before 1890; surveyed for Hindpur extension 1892-94; worked by SMR and from 1908 by M&SMR; became M&SMR, 1908*[[Guntakal-Mysore Frontier Railway]] opened c.1893. Worked by SMR, 1893; became and from 1908 by M&SMR, 1908
*[[Hindupur-Yesvantpur Railway]] opened 1893. Also known as Hindupur (Yesvantpur)-Mysore Frontier Railway, worked by SMR became M&SMR, 1908
*[[Hospet-Kottur Railway]] opened c.1905. Originally worked by SMR becoming and from 1908 by M&SMR, 1908*[[Kolhapur State Railway]] opened after 1888. Worked by SMR, 1891; became part of and from 1908 by M&SMR, 1908*[[West of India Portuguese Railway]] opened 1886-87. Worked by SMR, 1902; became 1902nd from 1908 by M&SMR, 1908*[[Sangli State Railway]] opened in 1907 as a short 5 mile(8km) link from SMR Miraj Junction to Sangli, Worked by SMR, 1907; became and from 1908 by M&SMR, 1908.
==Records==
9,628
edits

Navigation menu