Changes

Jump to navigation Jump to search

Southern Punjab Railway

2,040 bytes added, 11:11, 19 December 2016
New info added to 'History'; 'SPR Network of Lines..' replacing previous headings - withy references
==History==
The '''Southern Punjab Railway'''(SPR) Company was formed in 1895with [[Bradford Leslie]] as Chairman. Under contract with the Secretary of State for India, Leslie and his partners formed the company to build a BG Railway from [[Delhi]] to [[Samasata]] about 400 miles to the west. [[Horace Bell ]] was the Consulting Engineer for SPR in London for the construction.,  The main line ran north west from [[Delhi]] to [[Bhatinda]] then south west through Bahawalpur State to [[Samasata]], a total distance of 402 miles(643km). Several extension lines (Jullunder, Sutlej Valley etc.) extended the length to 502 miles(803km) in 1905.
The railway was worked by the North Western State(NWR) Railway (see "Records L/AG/46/34").
Purchased by Government in 1930.
==SPR Branch Network of Lines including Lines Managed and extensionsWorked ==*The listings below are generally based on the “Administration Report on Railways 1918” <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n121/mode/1up “Administration Report on Railways 1918” pages 120-126 (pdf 129-134]; Retrieved 18 Dec 2016</ref> with page numbers (and pdf pages) noted at the end of each entry. '''SPR Mainline and branches'''[[Rail_gauge#Broad_Gauge|BG]] Total line length 426 miles(685km). Page 121(pdf 130)*’Delhi-Samasata Mainline’, [[Delhi-Samasatta Railway]]''' was opened in 1897 by the SPR connecting via [[DelhiNarwana]] with , [[SamasattaJakhal]] via , [[Bhatinda]] to [[Samasata]], opened 1897, 399 miles(642km)**’Delhi Brewery Branch Line’, opened 1909, 0.8 mile(1. The line passed through 3km)**’[[MuktasarNarwana-Kaithal Railway|Narwana-Kaithal Branch Line]] and ’, opened 1899, from [[FazilkaNarwana]] and provided direct connection through to [[SamasattaKaithal]] , 23 miles(now in Pakistan37km) **’Jind City Branch Line’, from [[Jhind|Jind]] Junction to [[KarachiJhind|Jind]]City, opened 1916, 2. 5 miles(4km)  *'''[[McLeodganj Jullundur-Doab Railway| Jullundur-Doab Extension Railway]]''' [[Rail_gauge#Broad_Gauge|BG]] was an extension constructed Total line length 130 miles(209km). Page 123(pdf132)*’Jullunder-Ferozepore Mainline, [[Jullunder]] via Karpurthala, Sultanpur Lodi, Lohian Khas, Gidarpind, Makhu by SPR in 1905 and worked by them. Later renamed Mandi Sadiqgan to [[Ferozepore]] Cantonment, opened 1912-14, 73 miles(117km)**’Phillaur Branch Line’, Lohian Khas to [[Phillaur]], opened 1913, 39 miles(63km)**’[[Jullundur-Nakodar Chord Railway and now in Pakistan.]] known as the ‘Nakodar Branch Line’, [[Jullunder]] to [[Nakodar]], opened 1914, 19 miles(30km) *'''[[Narwana-Kaithal Ludhiana Extension Railway]]''' was opened in 1899 by SPR[[Rail_gauge#Broad_Gauge|BG]] Total line length 152 miles(244km). Page 123(pdf132)*’Ludhiana-Ferozepore Line’, linking [[KaithaLudhiana]] to [[NarwanaFerozepore]], from where opened 1905, 77 miles(124km)*’Ferozepore-MacLeod Ganj Line’, [[Ferozepore]] to McLeod Ganj (a branch line to suburb of [[KurukshetaDharamsala]] was ), opened in 1910.1906, 75 miles(120km)
==Railways absorbed into SPR==*'''[[Sutlej Valley Railway| Sutlej Valley Extension Railway]]''', opened 1910[[Rail_gauge#Broad_Gauge|BG]] Total line length 208 miles(335km). Constructed as part of Sutlej Valley Irrigation project; merged into SPR, 1917Pages 124-5(pdf135-18. The 6) *[[Kasur-Lodhran Railway]] section of this line was , [[Kasur]] to [[Lodhran]], opened 1910, closed and dismantled in 1917.-18, 208 miles(335km)
==Lines worked by SPR at some time== *'''[[NarwanaLudhiana-Dhuri-Kaithal Jakhal Railway]]'''[[Rail_gauge#Broad_Gauge|BG]] Total line length 79 miles(127km). Page 115(pdf124) *[[Ludhiana]] via [[Dhuri]] to [[Jakhal]], opened 1899, extended to Kuruksheta1901. Managed, 1910; maintained and worked by [[North Western Railway]] (NWR) under an Agreement with the [[Princely states|Princely ]][[Maler Kotla State]] Durbar and the [[Jhind State]] Durbars. The line was used by SPRlinking the ’Delhi-Samasata Mainline’ at [[Jakhal]] with '[[Ludhiana Extension Railway]]' at [[Ludhiana]].
==Records==
9,628
edits

Navigation menu