1,151
edits
Changes
Jump to navigation
Jump to search
m
no edit summary
== Characteristics ==
The line from [[Negapatam ]] to [[Trichinopoly ]] was completed by March 1862 to broad gauge standards and opened to traffic. In 1868, the GSIR line reached [[Erode]], connecting to the [[Madras Railway]]. In 1872, the GSIR merged with with the [[Carnatic Railway]], built to metre gauge, to form the [[South India Railway]].