Changes

Jump to navigation Jump to search

Baripada-Talbond Railway

15 bytes added, 08:18, 2 May 2017
m
no edit summary
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n19/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 11, listed as Mayurbhanj Extension Railway]; Retrieved 19 February 2016</ref>.
The line opened in 1920 joining [[Baripada]] to [[Talbond]](now named Talbandh), a length of 38 miles(61km) and was maintained, managed and worked by the [[Bengal-Nagpur Railway]](BNR).
==Records==
9,628
edits

Navigation menu