*1857 Aug, [[Messrs. Wythes and Jackson, Construction Contractors|Messrs. Wythes and Jackson]] were awarded the contract for the '''[[Thal Ghat Railway Construction]]'''
*1857-65. The [[Thal Ghat Railway Construction|Thal Ghat Railway]] was a major project to take the GIPR mainline across the Western Ghats towards [[Jubbulpore]]. The [[Kasara]] to [[Igatpuri]] section was 9.5 miles(15km) and within that distance the line had to rise to 1,918 feet(585m). The construction required 13 tunnels, 6 viaducts, including the [[Ehagaon Viaduct]]; cuttings; embankments; 15 bridges and culverts and the Reversing Station <ref>[http://books.google.com/books?id=a5MEAAAAMAAJ&printsec=frontcover&dq=bombay+mechanics&hl=en&ei=8FUcTMGmHqC0nAeWxImdDg&sa=X&oi=book_result&ct=result&resnum=1&ved=0CCwQ6AEwAA#v=onepage&q&f=false Google Books "Paper on the (GIPR) Thul Ghaut Railway" incline delivered to the Bombay Mechancs Institution in December 1860 by the GIPR Chief Engineer [[James John Berkley]], page 20.] Retrieved on 2 Jul 2016</ref>.
*c.1859-65, [[Messrs. Wythes and Jackson, Construction Contractors|Messrs. Wythes and Jackson]] were awarded a further contact to construct a further section of the GIPR north-eastern line from [[Igatpuri]] at the end of the Thal Ghat, this was opened in stages reaching [[Chalisgaon]] in 1861, [[Jalgaon]] in 1863 and [[Bhusawal]] in 1865, a total of 191.24 miles(307km)<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n73/mode/2up 1up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; pages 64-68, pdf pages 73-77]; Retrieved 6 Jun 2016</ref>.
*1861-65, [[Igatpuri]]-[[Jalgaon]]-[[Bhusawal]] progressivly opened.
*1863-67, [[GIPR Nagpur Branch]] from [[Bhusawal]] was built by [[Messrs. Lee, Watson and Ayton, Construction Contractors]].
*1865, with completion of [[Thal Ghat Railway Construction|Thal Ghat]] and the [[Taptee (Bhusawal) Viaduct GIPR| Taptee Viaduct]] near [[Bhusawal]] the mainline from [[Bombay ]] reached [[Khandwar]].
*1868 July, [[Robert Maitland Brereton]], GIPR Chief Engineer was given responsibility for completing the connection between [[Bhusawal]] and [[Jubbulpore]] which he completed many months ahead of schedule <ref name>[http://www.thestatesman.com/mobi/news/8th-day/the-opening-of-the-mumbai-to-kolkata-railway/141013.html#SL3vjC1hEy3Vmu3P.99 The Statesman, New Delhi "The opening of the Mumbai to Kolkata railway by Michael Sandford, May 9 2016]; Retrieved 3 Jul 2016</ref>.
*1868-70 the [[Khandwa]] to [[Itarsi]] section opened and with the [[Nerbudda (Itsari-Jubblepore) Bridge GIPR|Nerbudda Bridge ]] completed the line reached [[Jubbulpore]] in 1870
*1870 March 8. The [[Alfred Viaduct]] was inaugurated and named after the Duke of Edinburgh (Alfred Ernest Albert) who was visiting India and travelled by East Indian Railway from Calcutta. The Viceroy and the Governor of Bombay, Sir Fitzgerald Seymour had come from Bombay. With the opening of the GIPR North-Eastern Line the connection at [[Jubbulpore]] to the [[East Indian Railway]] (EIR) completed Dalhousie’s dream of a Bombay-Calcutta route.
*With the completion of the GIPR mainlines the three Presidency Capitals of Bombay, Madras and Calcutta were linked. The length of the route opened was then 1483 miles/2388 km <ref name=GIPR/>.
*1900 June 30, the assets of the GIPR were purchased by the GoI and merged with those of the [[Indian Midland Railway]] into a "new" GIPR, managed by the old company.
*The GIPR continued to expand its network with the addition of 'Branch Lines', 'Absorbsion' of certain railways being ‘Absorbed’ and 'Working Agreements' on other railways - [Great Indian Peninsula Railway - Lines owned and worked'|(''(see lists that follow)separate page''. – GIPR Lines Owned and Worked]]
*1918 Administration Report on Indian Railways gives the GIPR broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line length as 2668 miles(4293km); and including 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) lines, a total of 3441 miles(5331km) <ref name=Admin/>.
*1925 Jan 1, the GoI took over direct control of the GIPR and transferred the [[Allahabad]] to [[Jubbulpore]] branch of the [[East Indian Railway|EIR]] to the GIPR.
Bombay's [[Bombay Victoria Terminus Construction Railway|Victoria Terminus]] was both the principal station and GIPR's HQ; designed by [[architect]] Frederick William Stevens. [[Bombay Victoria Terminus Construction Railway|Victoria Terminus Construction]] commenced in 1878, it opened on Queen Victoria's 1887 Golden Jubilee and completed in 1888.
===Bombay Dock Railways===
The GIPR had a collection of sidings spurring off to the docks in the east Bombay. There were numerous spurs to:
*Victoria Dock 1891