Changes

Jump to navigation Jump to search

Barsi Light Railway

No change in size, 06:42, 19 August 2020
m
BLR System and Extensions
<blockquote> From Pandharpur to Bijapur, ‘a length of about 77 miles, which would form a chord between Poona and Bijapur branches of the South Mahratta Railway’ <ref name=Proj1906/>.</blockquote>
The ‘Statistics of Working’ show the year-by-year financial results from 1913-14 through to 1936-37 and the BSR BLR System rising from 116 miles(186km) reaching 203 miles (326km) from 1928-29 onwards<ref name=Hist1937/>
== Classification ==
9,628
edits

Navigation menu