Changes

Jump to navigation Jump to search

User:PEA-2292/My sandbox

5,888 bytes added, 19:36, 30 October 2020
no edit summary
[[File: Oudh & Rohilkhand Railway Map 1909, north-west section.png|thumb| Oudh & Rohilkhand Railway
Map 1909, north-west section]]
[[File: Oudh & Rohilkhand Railway Map 1909, south-east section.png|thumb| Oudh & Rohilkhand Railway Map 1909, south-east section]]
'''O&RR Lines Owned and Worked'''
<blockquote> a sub-section of the main page '''Mysore-Nanjangud [[Oudh and Rohilkhand Railway]]''' was a short metre gauge([[Rail_gauge_#Metre_Gauge|MG]]O&RR) line that extended the [[Mysore State The '''Oudh and Rohilkhand Railway]]''' (MSRO&RR) mainline from [[Mysore]] to [[Nanjangud]]. The railway was owned formed around 1872 by taking over the interests of the [[Princely states|Princely Indian Branch Railway]]’ / ‘Awadh Rohilkhand Railway‘ - [[Mysore State]Indian Branch Railway| ''see separate page for details''] Durbar and worked by the MSR<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n100/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 92]; Retrieved 26 Jan 2016</ref>.
The MSR became “Administration Report on Railways 1918” <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n140/mode/1up “Administration Report on Railways 1918” page 131 (pdf 140) ]; Retrieved 24 Oct 2020</ref> gives the ‘Lines Opened’ as 1510 miles(2430km) of the O&RR [[Madras and Southern Mahratta RailwayRail_gauge#Broad_Gauge|‘Broad Gauge (BG)]](M&SMR) in 1907, they worked the line until 1919lines.
In 1919, The O&RR was merged into the [[Mysore State]] successfully sought the reversion of the [[Mysore-Bangalore Railway| ‘Mysore -Bangalore Section’]] and two branch lines, the ‘[[Birur-Shimoga Railway]]’ and the ‘'''Mysore-Nanjangud Railway'''’ became the ‘[[Mysore State East Indian Railway]](MSREIR) <ref> British Library IOR L/F/8/20/1704‘Contract with the Madras and Southern Mahratta Railway Co.Ltd as to the transfer of Mysore-Nanjangud , Birur-Shimoga and Mysore-Bangalore Railways sections of the Mysore Railway to in 1925 when the Mysore Durbarlatter came into state management. Dated 24 Oct 1924 effective 1 Oct 1919</ref>
==Records==Refer to FIBIS Fact File #4: “Research sources for A small number of branches and extensions were constructed after 1918 by the O&RR before merger into the EIR. These are listed under the ‘EIR System’ in the “History of Indian Railways, 1845-1947” - available from the 1937”<ref name=Hist>[httphttps://wwwia801605.us.fibisarchive.org/store30/items/fibisin.ernet.dli.2015.36650/2015.36650.India-booksRailway-andBoard-publications/bffHistory-0004Of-researchIndian-sourcesRailways-forConstructed-indianAnd-railwaysIn-1845-1947/ Fibis shop]Progress.pdf US Archive . This Fact File contains invaluable advice on 'Researching ancestors in the UK records org pdf download of ‘History Of Indian Railways' with particular reference to the [[, constructed and in progress’, 31 March 1937 by ‘The Government of India Office Records]] (IOR) held at the [[British Library]- Railway Department’ page 84, pdf 113]; Retrieved 17 Oct 2020</ref> .
The following gives the O&RR lines that were opened on transfer to the ‘[[East Indian Railway]]’(EIR) in 1925. <br>This information below is taken from the “History of Railways” <ref name== References ==Hist/> . <references br>''Changes from the “1918 Administration Report“ <ref name=Hist/>are given in Italics''* ‘EIR Northern Mainline’ ''was O&RR Main Line'', 517 miles(832km) from [[Mogul Sarai]] to [[Saharanpur]], opened in stages - Mogul Sarai via [[Dufferin Bridge]] to Kashi (Benares Ganges), 1887 where it connected to Benares Cantonment which had opened in 1883; Benares Cantonment to Lucknow, 1893-94; Lucknow to Bareilly, 1872-73; Bareilly (chord line via Rampur) to Moradabad, 1894; Moradabad to Saharanpur, 1884-86. It is remarked that the ½ mile(0.8km) over Ramganga Bridge at Moradabad is mixed gauge BG and [[Rail_gauge#Broad_Gauge|BG]] and metre gauge([[Rail_gauge_#Metre_Gauge|MG]]), this line being shared with the ‘[[Rohilkund and Kumaon Railway]]’ (R&KR) ''Same as 1918 Report with slight mileage changes''* ‘Benares-Lucknow Loop’, 199 miles(320km)from Benares Cantonment via Fyzabad to Lucknow, 1872-74. ''No change''* ‘Bareilly-Morabad Loop’, 70 miles(113km) from Bareilly via Chandausi to Morabad, 1872-73. ''No change''* ‘Lucknow-Sultanpur-Zafarabad Branch’, 136 miles(219km) opened 1931-32 from Utratiya (near Lucknow) via Sultanpur to Zafarabad ''Constructed by EIR after 1925 as part of ‘EIR Northern Network''*Branches from the ‘Main Line’** ‘Cawnpore Branch’, 44 miles(71km) opened 1867 from Lucknow via the ‘[[Ganges River Bridge, Cawnpore]]’ to join the ‘East Indian Railway]]’(EIR) at Cawnpore. ''Same as 1918 Report with slight mileage changes''** ‘Belamau-Madhogan Branch’, opened 1903, 14 miles(23km) from Belamau to Madhogan. ''No change''** ‘Madhopar-Auhadpur Extension, opened 1909-10, 17 miles(27km) from Madhopar to Auhadpur. ''No change''** ‘Belamau-Sitapur Branch’, opened 1910, 37 miles(60km) from Belamau to Sitapur. ''No change''** ‘Rosa-Sitapur Branch’, opened 1910-14, 53 miles(85km) from Rosa to Sitapur City and Sitapur Cantonment. ''No change''** ‘Moradabad-Ghaziabad Branch’, opened 1900, 87 miles(140km) from Moradabad to Ghaziabad. ''No change''** ‘Hapar-Meerut Branch’, opened 1904, 18 miles(45km) from Hapar to Meerut. ''No change''** ‘Kotdwara Branch’, opened 1896, 15 miles(24km) from Najibabad Junction to the right hand side of Kob River opposite Kotdwara. ''No change''** ‘Hardwar Branch’ , opened 1886, 17 miles(43km) from Lhnaksar Junction to left bank of Ganges Canal near Jawalapur and on to Hardwar. ''No change''** ‘Rikhikesh Branch’, opened 1927, 7 miles(11km) from Raiwala to Rikhikesh. ''Constructed by EIR after 1925 as part of ‘EIR Northern Network''*Branches on the ‘Benares-Lucknow Loop** ‘Allahabad-Fyzabad Branch’, opened 1903-05, 93 miles (150km) from Fyzabad via Suiltanpur to Allahabad. The mileage given excludes 2½ miles(5.6km) of the ‘O&RR Main Line’between Partabgarh and Chilbila. ''No change''** ‘Allahabad-Jaunpur Branch‘, opened 1906-07, 58 miles(93km) from Phaphaman (near Allahabad) to Zafarabad (near Jaunpur) . ''No change''** ‘Bahramghat Branch’, opened 1872, 21½ miles(35km), from Bara Babki to Bahramghat, this included 17 miles(27km) . 'from Burhwal to Bara Banki which was mixed gauge - [[Rail_gauge#Broad_Gauge|BG]] and metre gauge([[Rail_gauge_#Metre_Gauge|MG]]), this line being shared with the ‘[[Bengal and North-Western Railway ]]’ (B&NWR) . ''No change''*Branches on the ‘Bareilly-Morabad Loop’** ‘Aligarh Branch’, opened 1872, 61 miles(98km), from Chandaui to Aligarh. ''No change''** ‘Allahabad-Rae Bareli-Cawnpore Branch’, opened 1911-12, 153 miles(248km) comprising three disconnected sections :- ‘Phaphaman-Rae Bareli ‘68 miles(km), ‘Daryapur-Dalman 15 miles(km) Umchahar -Unao 69 miles(km) . ''No change from 1916 Report'' but with the remark ‘The line was dismantled during the war, was relaid and opened 1927** ‘Gajraula-Chandpur Branch’, opened 1911, 22 miles(35km) from Gajroula Siau to Chandpur ''No change''** ‘Chandpur-Bijnor-Muazzampur Narayan Branch’, opened 1930, 37 miles(60km) as an extension , to the above, thus connecting Gajraula to Muazzampur Narayan** ‘Raja ka Sahaspur to Sambal Hatim Sarai Line’, opened 1912, 15 miles(24km) ''Not listed in 1918 Report'' but with the remark ‘The line was dismantled during the war, was relaid and opened 1922** ‘Akbarpur-Tanda Branch’, opened 1912, 11 miles(18km) from Akbarpur to Tanda. ''No change''
==Lines worked by O&RR ==''See separate pages for further information''* ‘[[Benares City Branch Railway]]’, opened 1900, 2 miles(3.2km) , [[Rail_gauge#Metre Gauge|Metre Gauge (MG)]] from the O&RR Benares Cantonment Station to Benares City. The line was owned by O&RR and linked to the ‘[[Bengal and North-Western Railway]]’ (B&NWR) system at Benares City. The line was wrked by B&NWR.* ‘[[Hardwar-Dehra Railway]]’, opened 1900, 32 miles(51km), privately-owned assisted [[Rail_gauge#Broad_Gauge| Broad Gauge (BG)]] branchline worked by O&RR and from 1925 by EIR* ‘[[Category:RailwaysCawnpore-Burhwal Railway]]’, opened 1896, 80 miles(129km), a [[Rail_gauge#Metre Gauge|Metre Gauge (MG)]] line, constructed and worked as State line up to 31 Mar 1915, then Government of India([[Government of India |GoI]]); managed and worked by O&RR and then by EIR from 1925. Described as the ‘Cawnpore-Burhwal Link’*[[Nalhati-Azimganj Railway]], opened 1863. Originally part of [[Category:Indian States RailwaysBranch Railway]], [[Rail_gauge#Unique_Gauge| unique 4ft gauge]]; worked by O&RR, 1863-72; run as State Rly, 1872; leased to [[East Indian Railway]](EIR), 1892 and later onverted to BG ==Lines surveyed by O&RR ==*[[Tilhar-Budaun-Hapur Railway Survey]]. Under survey by O&RR,1909 . Ref Civil List 1909 page 379 – Railways O&RR - this line was not constructed.
9,628
edits

Navigation menu