Suchetgarh-Jammu Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed
Line 1: Line 1:
'''Suchetgarh-Jammu Railway'''
The '''Suchetgarh-Jammu Railway''' opened 1890 as a Kashir Darbar line, worked by [[North Western Railway]](NWR) and incorporated into the [[Jammu-Sialkot Railway]]
 
Opened 1890 as a Kashir Darbar line, worked by NWR and incorporated into Jammu–Sialkot Railway (qv)
 
{{Work-in-Progress-Rly}}


[[Category:Railways]]
[[Category:Railways]]
[[Category:Indian States Railways]]
[[Category:Indian States Railways]]

Revision as of 17:53, 5 December 2015

The Suchetgarh-Jammu Railway opened 1890 as a Kashir Darbar line, worked by North Western Railway(NWR) and incorporated into the Jammu-Sialkot Railway